Difference between revisions of "Preparations-DOE2015-Nov-Review"
From Hall A Wiki
Line 9: | Line 9: | ||
* Dry run talks ( on Nov 5th) from 8:30-2 in L102 ( Bluejeans :Meeting ID: 179417237 +1.888.240.2560(US Toll Free)) | * Dry run talks ( on Nov 5th) from 8:30-2 in L102 ( Bluejeans :Meeting ID: 179417237 +1.888.240.2560(US Toll Free)) | ||
** 8:30-8:50 SBS Science Update and Overview [https://hallaweb.jlab.org/wiki/images/3/30/SBS_Science.pptx.pdf Talk] (Wojtsekhowski) | ** 8:30-8:50 SBS Science Update and Overview [https://hallaweb.jlab.org/wiki/images/3/30/SBS_Science.pptx.pdf Talk] (Wojtsekhowski) | ||
− | ** 8:50-9:20 SBS Project: Cost, Schedule and Management (Jones) | + | ** 8:50-9:20 SBS Project: Cost, Schedule and Management [https://hallaweb.jlab.org/wiki/images/e/ef/SBS_management_Nov-2015.pdf Talk] (Jones) |
** 9:20-9:40 Dependency overview (Keppel) | ** 9:20-9:40 Dependency overview (Keppel) | ||
** 9:40-10:30 WBS 1 – SBS Basic: Magnet and Infrastructure [https://hallaweb.jlab.org/wiki/images/c/cb/SBS-Wines-Nov2015.pdf Talk] (Wines) | ** 9:40-10:30 WBS 1 – SBS Basic: Magnet and Infrastructure [https://hallaweb.jlab.org/wiki/images/c/cb/SBS-Wines-Nov2015.pdf Talk] (Wines) |
Revision as of 19:12, 4 November 2015
Response to DOE 2014 review report
- Final report from DOE Nov 2014 SBS review.
- DOE Nov 2014 recommendations with responses. Initial response to the recommendations and comments.
DOE 2015 review
- Draft agenda.
- Initial Drafts due by October 21st for posting to wiki and overview by collaboration.
- Dry run talks ( on Nov 5th) from 8:30-2 in L102 ( Bluejeans :Meeting ID: 179417237 +1.888.240.2560(US Toll Free))
- 8:30-8:50 SBS Science Update and Overview Talk (Wojtsekhowski)
- 8:50-9:20 SBS Project: Cost, Schedule and Management Talk (Jones)
- 9:20-9:40 Dependency overview (Keppel)
- 9:40-10:30 WBS 1 – SBS Basic: Magnet and Infrastructure Talk (Wines)
- 10:30- 11:10 WBS 2 – Neutron Form Factor: Talk CDet (Khandaker)
- 11:10-11:50 Background MC – all experiments Talk (Riordan)
- 11:50-12:10 DAQ VME and Fastbus Talk (Moffitt)
- 12:10-12:30 WBS 3 – Proton Form Factor: GEM (Liyanage)
- Breakout: Dependencies ( for Dry Run we will NOT go through Dependency talks, but needed for Nov 9th to post for DOE reviewers)
- Polarized 3He target (Cates)
- HCal ( Franklin)
- ECal (Riordan)
- GRINCH (Averett)
- Nov 9th post plenary and breakout session talks for DOE reviewers.
- Additional material for the DOE reviewers
- Updated PMP
- Monthly reports
- Recommendations tracker
- Background calculations for electronic hut.