Difference between revisions of "Preparations-DOE2016-Nov-Review"

From Hall A Wiki
Jump to: navigation, search
(DOE 2015 review ( Nov 7 and 8th ))
Line 13: Line 13:
 
**[https://hallaweb.jlab.org/wiki/index.php/SBS_DOE_Monthly_Reports Monthly reports]
 
**[https://hallaweb.jlab.org/wiki/index.php/SBS_DOE_Monthly_Reports Monthly reports]
 
**Recommendations tracker
 
**Recommendations tracker
 +
**Conceptual design report for the polarize 3He target

Revision as of 15:24, 20 July 2016

Response to DOE 2015 review report

  1. report from DOE Nov 2015 SBS review.
  2. DOE Nov 2015 recommendations with responses. Initial response to the recommendations and comments.

DOE 2015 review ( Nov 7 and 8th )

  • Agenda.
  • Initial Drafts due by October 3rd for posting to wiki and overview by collaboration.
  • Dry run talks sometime between Oct 17-28th. Talk are due to Review committee by Nov 3rd.
  • Background Material (provide to Review committee by Oct 24th)
    • PMP
    • Report on the thermal annealing test of prototype calorimeter.
    • Monthly reports
    • Recommendations tracker
    • Conceptual design report for the polarize 3He target