Difference between revisions of "Preparations-DOE2017-Closeout"
From Hall A Wiki
(→DOE 2007 Closeout (June 6th)) |
(→DOE 2007 Closeout (June 6th)) |
||
Line 2: | Line 2: | ||
*Project Closeout/Transition to Operations Review of the Super Big Bite Spectrometer (SBS) | *Project Closeout/Transition to Operations Review of the Super Big Bite Spectrometer (SBS) | ||
*The ZOOM meeting will be coordinated by DOE (the details at a later date). | *The ZOOM meeting will be coordinated by DOE (the details at a later date). | ||
− | *Agenda | + | *Agenda [https://hallaweb.jlab.org/wiki/images/f/fd/SBS_Agenda_2017.pdf] |
*Documents | *Documents | ||
**Transition to Operations [https://hallaweb.jlab.org/wiki/images/c/c7/Transition_to_Operations.pdf document.] | **Transition to Operations [https://hallaweb.jlab.org/wiki/images/c/c7/Transition_to_Operations.pdf document.] |
Revision as of 17:28, 16 May 2017
DOE 2007 Closeout (June 6th)
- Project Closeout/Transition to Operations Review of the Super Big Bite Spectrometer (SBS)
- The ZOOM meeting will be coordinated by DOE (the details at a later date).
- Agenda [1]
- Documents
- JLab GMn Experimental Readiness Review (ERR)
- Charge [2]
- Review committee: Bernd Surrow (GEM), Alexander Somov (Trigger), Chris Cuevas (Electronics), Yves Roblin (Beam Operation), Dave Gaskell (Beam line/Target) chair, Pavel Degtiarenko (Radiation), Bert Manzlak (EHS&Q), Stepan Stepanyan (Calorimeter), Javier Gomez (observer), Ed Folts (observer)
- Agenda [3]
- Background Material
- PMP with updated organizational chart.
- Monthly reports
- Quarterly reports
- Previous DOE Review Reports
- 2013 Review:Cover letter,Excerpts from review,Final report,Indico webpage.
- 2014 review:Cover letter,Excerpts from review,Final report,Indico webpage.
- 2015 review:Cover letter,Excerpts from review,Final report,Indico webpage.
- 2016 review:Excerpts from review,Final report,Indico webpage.