Difference between revisions of "Preparations-DOE2017-Closeout"

From Hall A Wiki
Jump to: navigation, search
(DOE 2007 Closeout (June 6th))
m
Line 1: Line 1:
===DOE 2007 Closeout (June 6th) ===
+
===DOE 2017 Closeout (June 6th) ===
 
*Project Closeout/Transition to Operations Review of the Super Big Bite Spectrometer (SBS)
 
*Project Closeout/Transition to Operations Review of the Super Big Bite Spectrometer (SBS)
 
*The ZOOM meeting will be coordinated by DOE (the details at a later date).
 
*The ZOOM meeting will be coordinated by DOE (the details at a later date).

Revision as of 17:28, 16 May 2017

DOE 2017 Closeout (June 6th)