Difference between revisions of "Preparations-DOE2017-Closeout"
From Hall A Wiki
m (→DOE 2007 Closeout (May 15th)) |
m (→DOE 2007 Closeout (June 6th)) |
||
Line 1: | Line 1: | ||
===DOE 2007 Closeout (June 6th) === | ===DOE 2007 Closeout (June 6th) === | ||
− | *Project Closeout/Transition to Operations Review of the Super Big Bite Spectrometer (SBS) | + | *Project Closeout/Transition to Operations Review of the Super Big Bite Spectrometer (SBS) |
*The ZOOM meeting will be coordinated by DOE (the details at a later date). | *The ZOOM meeting will be coordinated by DOE (the details at a later date). | ||
*Agenda | *Agenda |
Revision as of 14:53, 16 May 2017
DOE 2007 Closeout (June 6th)
- Project Closeout/Transition to Operations Review of the Super Big Bite Spectrometer (SBS)
- The ZOOM meeting will be coordinated by DOE (the details at a later date).
- Agenda
- Documents
- Background Material
- PMP with updated organizational chart.
- Monthly reports
- Quarterly reports
- Previous DOE Review Reports
- 2013 Review:Cover letter,Excerpts from review,Final report,Indico webpage.
- 2014 review:Cover letter,Excerpts from review,Final report,Indico webpage.
- 2015 review:Cover letter,Excerpts from review,Final report,Indico webpage.
- 2016 review:Excerpts from review,Final report,Indico webpage.