Difference between revisions of "Preparations-DOE2017-Closeout"
From Hall A Wiki
(→DOE 2017 Closeout (June 6th)) |
|||
Line 1: | Line 1: | ||
− | === | + | ===Project Closeout/Transition to Operations Review of the Super Big Bite Spectrometer (SBS) (June 6th 2017) === |
− | + | ||
*The ZOOM meeting will be coordinated by DOE (the details at a later date). | *The ZOOM meeting will be coordinated by DOE (the details at a later date). | ||
*Agenda [https://hallaweb.jlab.org/wiki/images/f/fd/SBS_Agenda_2017.pdf] | *Agenda [https://hallaweb.jlab.org/wiki/images/f/fd/SBS_Agenda_2017.pdf] |
Revision as of 08:39, 22 May 2017
Project Closeout/Transition to Operations Review of the Super Big Bite Spectrometer (SBS) (June 6th 2017)
- The ZOOM meeting will be coordinated by DOE (the details at a later date).
- Agenda [1]
- Charge [2]
- Review panel [3]
- Talks
- 1st talk: SBS Project: COst, Schedule, Management and KPPs
- 2nd talk: Transition to Operations
- Documents
- JLab GMn Experimental Readiness Review (ERR)
- Charge [4]
- Review committee: Bernd Surrow (GEM), Alexander Somov (Trigger), Chris Cuevas (Electronics), Yves Roblin (Beam Operation), Dave Gaskell (Beam line/Target) chair, Pavel Degtiarenko (Radiation), Bert Manzlak (EHS&Q), Stepan Stepanyan (Calorimeter), Javier Gomez (observer), Ed Folts (observer)
- Agenda [5]
- Background Material
- PMP with updated organizational chart.
- Monthly reports
- Quarterly reports
- Previous DOE Review Reports
- 2013 Review:Cover letter,Excerpts from review,Final report,Indico webpage.
- 2014 review:Cover letter,Excerpts from review,Final report,Indico webpage.
- 2015 review:Cover letter,Excerpts from review,Final report,Indico webpage.
- 2016 review:Excerpts from review,Final report,Indico webpage.