Difference between revisions of "Run Plan (DVCS3)"

From Hall A Wiki
Jump to: navigation, search
Line 8: Line 8:
  
 
[[Winter 2016 calorimeter calibration (elastic)]]
 
[[Winter 2016 calorimeter calibration (elastic)]]
 +
 +
[[https://logbooks.jlab.org/files/2015/05/3338049/LH2runplan-dwh.pdf  Target boiling]]
  
 
[[Fall 2014 run plan]]
 
[[Fall 2014 run plan]]

Revision as of 15:56, 12 February 2016

For the 12 GeV DVCS experiment, go to [DVCS3 wiki ].

For this Winter 2016 we are only scheduled for 10 week. Therefore we estimate that we will only be able to take the data points highlighted in green.

DVCS-kin-E12-06-114 02-10-16.jpg

Winter 2016 optic plans

Winter 2016 calorimeter calibration (elastic)

[Target boiling]

Fall 2014 run plan