Difference between revisions of "SBS 2017 GMn Experimental Readiness Review"
From Hall A Wiki
(→Agenda) |
(→Agenda) |
||
Line 23: | Line 23: | ||
| 9:10 || '''Charge Item 5''': Overview, general requirements ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/tbd TBD]) || Brian Quinn (15+10) | | 9:10 || '''Charge Item 5''': Overview, general requirements ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/tbd TBD]) || Brian Quinn (15+10) | ||
|- | |- | ||
− | | 9:35 || '''Charge Item 1,5''': Apparatus ownership, maintenance and control;<br> Equipment to achieve the scientific goals; Safety Docs ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/GMN-ERR-M-Jones.pdf pdf]) || Mark Jones (20+20) | + | | 9:35 || '''Charge Item 1,5''': Apparatus ownership, maintenance and control;<br> Equipment to achieve the scientific goals; Safety Docs ([http://hallaweb.jlab.org/12GeV/SuperBigBite/documents/ERR2017/final/GMN-ERR-M-Jones.pdf pdf]) || Mark Jones (20+20) |
|- | |- | ||
| 10:15 || Break || (15) | | 10:15 || Break || (15) |
Revision as of 15:18, 13 June 2017
Overview
Experimental Readiness Review 2017
- Date: 15-16 June 2017 (Thursday/Friday)
- Location: L102
- ERR Committee Bernd Surrow (GEM), Alexander Somov (Trigger), Chris Cuevas (Electronics), Yves Roblin (Beam Operation),
Dave Gaskell (Beam line/Target) chair, Pavel Degtiarenko (Radiation), Bert Manzlak (EHS&Q),
Stepan Stepanyan (Calorimeter), Javier Gomez (observer), Ed Folts (observer)
- ERR Charge (pdf)
Agenda
Thursday Morning | |||
8:30 | Closed Session , | (30) | |
9:00 | Remarks from Chair and Charge | Chair (10) | |
9:10 | Charge Item 5: Overview, general requirements (TBD) | Brian Quinn (15+10) | |
9:35 | Charge Item 1,5: Apparatus ownership, maintenance and control; Equipment to achieve the scientific goals; Safety Docs (pdf) |
Mark Jones (20+20) | |
10:15 | Break | (15) | |
10:30 | Charge Item 2,3: Beamline, supports,SBS and BigBite magnets, major engineering hardware (pdf) | Robin Wines (30+15) | |
11:15 | Charge Item 2,3: HCal (pdf) | Gregg Franklin (15+5) | |
11:35 | Charge Item 5c: HCal efficiency calibration (TBD) | Brian Quinn (10+5) | |
11:50 | Charge Item 2,3: Bigbite non-GEMs (pdf) | Todd Averett (20+15) | |
12:25 | Working Lunch | ||
Afternoon | |||
13:30 | Charge Item 2,3: GEMs (TBD) | Nilanga Liyanage (20+20) | |
14:10 | Charge Item 2,3: CDet (TBD) | Peter Monaghan (15+5) | |
14:30 | Charge Item 2: Installation (TBD) | Jessie Butler (20+20) | |
15:10 | Break | (15) | |
15:25 | Charge Item 3,5a: Software; GEM reconstruction efficiency at high rate (TBD) | Seamus Riordan (30+20) | |
16:15 | Charge Item 4: Target, scattering chamber, and radiator (pdf) | David Meekins (15+5) | |
16:35 | Charge Item 5b: High trigger rate capabilities. What are the expected accidentals? (pdf pptx) | Alexandre Camsonne (15+15) | |
17:05 | End | ||
Friday Morning | |||
9:00 | Charge Item 6,7: fringe field effects; Beam commissioning / machine protection (pdf) | Jay Benesch (15+15) | |
9:30 | Charge Item 8: radiation levels, local shielding; RSAD (TBD) | Andrew Puckett (20+20) | |
10:10 | End | ||
x:xx | Closed Session | ||
13:00 | Close Out | ||
Draft of COO (pdf) | |||
Draft of ERG (pdf) and chart (pdf) | |||
Draft of ESAD (TBD) | |||
Input for RSAD from Radcon (radiation budget form) (pdf) and (pdf) | |||
Draft of OSP for GEM detectors (pdf) | |||
Draft of OSP for BigBite magnet (pdf) | |||
Draft of OSP for BigBite rotation (pdf) | |||
Draft of OSP GRINCH Cherenkov detector (pdf) | |||
Draft of OSP for BigBite timing hodoscope (pdf) | |||
Draft of OSP for Hadron Calorimeter, HCal-J (pdf) | |||
Draft of OSP for Coordinate Detector, CDet (pdf) |