SBS 2020 GEn Experimental Readiness Review
From Hall A Wiki
Overview
Hall A E12-09-016 (Measurement of the Neutron Electromagnetic Form Factor Ratio GEn/GMn at High Q2) Experiment Readiness Review
Experimental Readiness Review 2020
- Date: 22 October, 2020 (Thursday)
- Location: Remote
- ERR Committee
Haiyan Gao (chair),
Brian Eng (GEM), Dave Gaskell (Beam line/target), James Maxwell (Target), Yves Roblin (Beam Operation), Brad Sawatzky (Target operational experience), Alexander Somov (Trigger), Stepan Stepanyan (Calorimeter), Chris Cuevas (Electronics),
Bert Manzlak (EHS&Q), Pavel Degtiarenko (Radiation), Ed Folts (observer), Javier Gomez (observer)
Agenda
Thursday Morning Session | |||
8:00 | Closed Session | (30) | |
8:30 | Remarks from Chair and Charge | Chair (10) | |
8:40 | Experiment Overview | Bogdan Wojtsekhowski (10+10) | |
9:00 | Charge Item 1: Design report (non-target) including modifications to beamline, SBS and detectors to accommodate polarized target | Robin Wines (20+10) | |
9:30 | Charge Items 2, 3: Target Introduction/Overview | Gordon Cates (10+5) | |
9:45 | Charge Item 2 (target): Integrated System-Target Design and Fabrication | Bert Metzger (20 + 10) ? | |
10:15 | Break | (15) | |
10:30 | Charge Item 2: Target configuration, performance requirement, Subsystems, including cells and lasers, lessons learned and timeline | Gordon Cates (40 + 20) | |
11:30 | Charge Item 3: Effect of Spectrometer fields, Magnetic Shielding and Simulation | Vladimir Nelyubin (20+10) ? | |
12:00 | Lunch | (60) | |
Afternoon Session | |||
13:00 | Charge Item 2 (non-target): Status of the equipment required for this experiment. Completion, commissioning. | Mark Jones (30+10) | |
13:30 | Charge Items 1, 2, 4: Equipment ownership, maintenance, control. Installation plans, timeline | Jessie Butler (20 + 10) ? | |
14:00 | Charge Item 5: Data Analysis & Simulation, Software Status, time to 1st publication | Andrew Puckett (20+10) ? | |
14:30 | Break | (20) | |
14:50 | Charge Item 6: Radiation and Shielding | Pavel Degtairenko (20+10) ? | |
15:20 | Charge Item 7: Beam Commissioning and | Yves Roblin (20+10) ? | |
15:50 | Charge Item 4: Personpower and responsibilities | Todd Averett (20+10) | |
16:20 | Charge Item 8: Safety Documents, target and non-target | Jian-ping Chen ?, Todd Averett (20+10) | |
16:50 | Closeout Session | ||
Draft of COO (pdf) | |||
Draft of ERG (pdf) and chart (pdf) | |||
Draft of ESAD (pdf) NEEDS UPDATE | |||
Input for RSAD from Radcon (radiation budget form) (pdf) and (pdf) NEEDS UPDATE | |||
Draft of OSP for GEM detectors (pdf) | |||
Draft of OSP for BigBite magnet (pdf) | |||
Draft of OSP for BigBite rotation (pdf) | |||
Draft of OSP GRINCH Cherenkov detector (pdf) | |||
Draft of OSP for BigBite timing hodoscope (pdf) | |||
Draft of OSP for Hadron Calorimeter, HCal-J (pdf) | |||
Draft of OSP for Coordinate Detector, CDet (pdf) |