SBS 2022 ALL Experimental Readiness Review
From Hall A Wiki
Overview
Hall A E12-21-005 (Double Spin Asymmetry in Wide-Angle Charged Pion Photoproduction) Experiment Readiness Review
Experimental Readiness Review 2022
- Date: 18 May, 2022 (Thursday)
- Location: Remote
- Meeting link:
- ERR Committee (chair),
FINAL REPORT
Agenda
Thursday Morning | |||
8:00 | Closed Session | (20) | |
8:20 | Remarks from Chair and Charge | H. Gao (10) | |
8:30 | Experiment Overview (pdf) | Bogdan Wojtsekhowski (10+10) | |
8:50 | Charge Item 1: Design report (non-target) including modifications to beamline, SBS and detectors to accommodate polarized target (ppt , pdf) | Robin Wines (20+10) | |
9:20 | Charge Items 2, 3: Target overview, configuration, performance requirement. Subsystems, including cells and lasers, lessons learned and timeline (pdf) | Gordon Cates (40+20) | |
10:20 | Break | (15) | |
10:35 | Charge Item 2 (target): Integrated System-Target Design and Fabrication (ppt , pdf) Supplemental: Assembly and Drawings (link in pdf) (xls , pdf) | Bert Metzger (20+10) | |
11:05 | Charge Item 3: Effect of Spectrometer fields, Magnetic Shielding and Simulation (pdf) | Vladimir Nelyubin (20+10) | |
11:35 | Charge Item 2 (non-target): Status of the equipment required for this experiment. Completion, commissioning. (ppt , pdf) | Mark Jones (30+10) | |
12:15 | Lunch | (45) | |
Afternoon Session | |||
13:00 | Charge Items 1, 2, 4: Equipment ownership, maintenance, control. Installation plans, timeline (pdf) | Jessie Butler (20+10) | |
13:30 | Charge Item 5: Data Analysis & Simulation, Software Status, time to 1st publication (pdf) | Andrew Puckett (20+10) | |
14:00 | Charge Item 6: Radiation and Shielding (pdf) | Eric Fuchey (20+10) | |
14:30 | Charge Item 7: Beam Commissioning and Machine Protections Systems (pdf) | David Flay (20+10) | |
15:00 | Charge Item 4: Personpower and responsibilities (ppt , pdf) | Todd Averett (20+10) | |
15:30 | Charge Item 8: Safety Documents, target and non-target (in previous pdf) | Todd Averett (15+5) | |
15:50 | Break | (10) | |
16:00 | Closed Session | (90) | |
17:30 | Closeout | ||
| |||
Draft of COO (pdf) | |||
Draft of ERG (pdf) and chart (pdf) | |||
Draft of ESAD PLACEHOLDER, GEn VERSION NEEDED | |||
Input for RSAD from Radcon (radiation budget form) (pdf) | |||
Draft of LOSP for pol3He target (pdf) | |||
Draft of OSP for pol3He target (pdf) | |||
Draft of OSP for GEM detectors (pdf) | |||
Draft of OSP for BigBite magnet (pdf) | |||
Draft of OSP for BigBite rotation (pdf) | |||
Draft of OSP GRINCH Cherenkov detector (pdf) | |||
Draft of OSP for BigBite timing hodoscope (pdf) | |||
Draft of OSP for Hadron Calorimeter, HCal-J (pdf) | |||
Draft of OSP for Coordinate Detector, CDet (pdf) |