(Created page with "*Updates ** *Fixed issues **platfor freezing ? **TS to TI connection for SBS GEM rocs : changed transceivers *Pending issues **DC1 crashing with SBS **HRS beam crate fiber...")
 
 
Line 1: Line 1:
 
*Updates
 
*Updates
**
+
**Helicity
 +
***ready to try to test communicating with injector
 +
***would like to do today or tomorrow : patch helicity in BCM for quick check of helicity in main and parity
 +
***will check helicity scalers at the same time
 +
***software for helicity decoding : needs to push latest version after a few checks
 +
***new helicity decoding board : moved forward with board production, Hall B was testing, will check if they had issues. One used in UITF looks fine
 +
**HCAL
 +
***no updates but
 +
**Coincidence trigger
 +
***HCal different PMTs supposed to be 10 ns difference, up to 40 ns difference (maybe due to front end or cables,mostly bottom part ) , Jiwan looking more into it, width ~ 50 ns
 +
**BB shower
 +
***stable for DAQ
 +
*** 1 PMT base replaced
 +
*** need to take run to check, looks He3 stable on scope
 +
*** new calibration procedure automatized , will look at latest
 +
**He3 target
 +
***need any variables besides EPICS
 +
***seems only EPICS : need list of variables for start / end of run and EPICS logger
 +
**BB GEM
 +
***BB GEM stable
 +
***New firmware for Common Mode calculation, using same alogorithm off line off by 3 ADC values , Ben checking
 +
**SBS GEM
 +
***taking cosmics
 +
***working on merging with main DAQ
 +
***stability issues fixed disabling 2 APVs ( out from acceptance )
  
  
 
*Fixed issues
 
*Fixed issues
**platfor freezing ?
+
**platform freezing ? Bryan increased the open files limit to 2000 siggested to increase to 4000, sockets time out  after two minutes : better reset before powercycling and not reset two minutes after cycling
**TS to TI connection for SBS GEM rocs : changed transceivers
+
**TS to TI connection for SBS GEM rocs : Anu changed transceivers
  
 
*Pending issues
 
*Pending issues
**DC1 crashing with SBS
+
**DC1 crashing with SBS : buffer might be need to set higher value, in log slave readout list using port 5 inserting dummy data ( can comment or remove )
**HRS beam crate fiber lost
+
**HRS beam crate fiber lost : will check
 +
**hodoscope crate making in config without GEMs : might be limited because of buffer level and trigger
 +
 
 +
*Plan
 +
** put SBS DAQ in main DAQ
 +
** test high data rate with several event builder
 +
 
 +
Beam planned for Sept 26

Latest revision as of 08:28, 14 September 2022

  • Updates
    • Helicity
      • ready to try to test communicating with injector
      • would like to do today or tomorrow : patch helicity in BCM for quick check of helicity in main and parity
      • will check helicity scalers at the same time
      • software for helicity decoding : needs to push latest version after a few checks
      • new helicity decoding board : moved forward with board production, Hall B was testing, will check if they had issues. One used in UITF looks fine
    • HCAL
      • no updates but
    • Coincidence trigger
      • HCal different PMTs supposed to be 10 ns difference, up to 40 ns difference (maybe due to front end or cables,mostly bottom part ) , Jiwan looking more into it, width ~ 50 ns
    • BB shower
      • stable for DAQ
      • 1 PMT base replaced
      • need to take run to check, looks He3 stable on scope
      • new calibration procedure automatized , will look at latest
    • He3 target
      • need any variables besides EPICS
      • seems only EPICS : need list of variables for start / end of run and EPICS logger
    • BB GEM
      • BB GEM stable
      • New firmware for Common Mode calculation, using same alogorithm off line off by 3 ADC values , Ben checking
    • SBS GEM
      • taking cosmics
      • working on merging with main DAQ
      • stability issues fixed disabling 2 APVs ( out from acceptance )


  • Fixed issues
    • platform freezing ? Bryan increased the open files limit to 2000 siggested to increase to 4000, sockets time out after two minutes : better reset before powercycling and not reset two minutes after cycling
    • TS to TI connection for SBS GEM rocs : Anu changed transceivers
  • Pending issues
    • DC1 crashing with SBS : buffer might be need to set higher value, in log slave readout list using port 5 inserting dummy data ( can comment or remove )
    • HRS beam crate fiber lost : will check
    • hodoscope crate making in config without GEMs : might be limited because of buffer level and trigger
  • Plan
    • put SBS DAQ in main DAQ
    • test high data rate with several event builder

Beam planned for Sept 26