(Created page with "*Updates ** *Fixed issues **platfor freezing ? **TS to TI connection for SBS GEM rocs : changed transceivers *Pending issues **DC1 crashing with SBS **HRS beam crate fiber...") |
|||
Line 1: | Line 1: | ||
*Updates | *Updates | ||
− | ** | + | **Helicity |
+ | ***ready to try to test communicating with injector | ||
+ | ***would like to do today or tomorrow : patch helicity in BCM for quick check of helicity in main and parity | ||
+ | ***will check helicity scalers at the same time | ||
+ | ***software for helicity decoding : needs to push latest version after a few checks | ||
+ | ***new helicity decoding board : moved forward with board production, Hall B was testing, will check if they had issues. One used in UITF looks fine | ||
+ | **HCAL | ||
+ | ***no updates but | ||
+ | **Coincidence trigger | ||
+ | ***HCal different PMTs supposed to be 10 ns difference, up to 40 ns difference (maybe due to front end or cables,mostly bottom part ) , Jiwan looking more into it, width ~ 50 ns | ||
+ | **BB shower | ||
+ | ***stable for DAQ | ||
+ | *** 1 PMT base replaced | ||
+ | *** need to take run to check, looks He3 stable on scope | ||
+ | *** new calibration procedure automatized , will look at latest | ||
+ | **He3 target | ||
+ | ***need any variables besides EPICS | ||
+ | ***seems only EPICS : need list of variables for start / end of run and EPICS logger | ||
+ | **BB GEM | ||
+ | ***BB GEM stable | ||
+ | ***New firmware for Common Mode calculation, using same alogorithm off line off by 3 ADC values , Ben checking | ||
+ | **SBS GEM | ||
+ | ***taking cosmics | ||
+ | ***working on merging with main DAQ | ||
+ | ***stability issues fixed disabling 2 APVs ( out from acceptance ) | ||
*Fixed issues | *Fixed issues | ||
− | ** | + | **platform freezing ? Bryan increased the open files limit to 2000 siggested to increase to 4000, sockets time out after two minutes : better reset before powercycling and not reset two minutes after cycling |
− | **TS to TI connection for SBS GEM rocs : changed transceivers | + | **TS to TI connection for SBS GEM rocs : Anu changed transceivers |
*Pending issues | *Pending issues | ||
− | **DC1 crashing with SBS | + | **DC1 crashing with SBS : buffer might be need to set higher value, in log slave readout list using port 5 inserting dummy data ( can comment or remove ) |
− | **HRS beam crate fiber lost | + | **HRS beam crate fiber lost : will check |
+ | **hodoscope crate making in config without GEMs : might be limited because of buffer level and trigger | ||
+ | |||
+ | *Plan | ||
+ | ** put SBS DAQ in main DAQ | ||
+ | ** test high data rate with several event builder | ||
+ | |||
+ | Beam planned for Sept 26 |
Latest revision as of 08:28, 14 September 2022
- Updates
- Helicity
- ready to try to test communicating with injector
- would like to do today or tomorrow : patch helicity in BCM for quick check of helicity in main and parity
- will check helicity scalers at the same time
- software for helicity decoding : needs to push latest version after a few checks
- new helicity decoding board : moved forward with board production, Hall B was testing, will check if they had issues. One used in UITF looks fine
- HCAL
- no updates but
- Coincidence trigger
- HCal different PMTs supposed to be 10 ns difference, up to 40 ns difference (maybe due to front end or cables,mostly bottom part ) , Jiwan looking more into it, width ~ 50 ns
- BB shower
- stable for DAQ
- 1 PMT base replaced
- need to take run to check, looks He3 stable on scope
- new calibration procedure automatized , will look at latest
- He3 target
- need any variables besides EPICS
- seems only EPICS : need list of variables for start / end of run and EPICS logger
- BB GEM
- BB GEM stable
- New firmware for Common Mode calculation, using same alogorithm off line off by 3 ADC values , Ben checking
- SBS GEM
- taking cosmics
- working on merging with main DAQ
- stability issues fixed disabling 2 APVs ( out from acceptance )
- Helicity
- Fixed issues
- platform freezing ? Bryan increased the open files limit to 2000 siggested to increase to 4000, sockets time out after two minutes : better reset before powercycling and not reset two minutes after cycling
- TS to TI connection for SBS GEM rocs : Anu changed transceivers
- Pending issues
- DC1 crashing with SBS : buffer might be need to set higher value, in log slave readout list using port 5 inserting dummy data ( can comment or remove )
- HRS beam crate fiber lost : will check
- hodoscope crate making in config without GEMs : might be limited because of buffer level and trigger
- Plan
- put SBS DAQ in main DAQ
- test high data rate with several event builder
Beam planned for Sept 26