Difference between revisions of "Shift How-To"

From Hall A Wiki
Jump to: navigation, search
(Reporting and Logging)
(5 intermediate revisions by 3 users not shown)
Line 10: Line 10:
  
 
== Reporting and Logging ==
 
== Reporting and Logging ==
Shift takers should regularly log shift details in HALOG - the Hall A electronic logbook.
+
All shift takers should regularly log shift details in HALOG - the Hall A electronic logbook.
 
* [http://logbooks.jlab.org/book/halla Link to HALOG]
 
* [http://logbooks.jlab.org/book/halla Link to HALOG]
 
* [[Creating HALOG entries]]
 
* [[Creating HALOG entries]]
Line 30: Line 30:
  
 
= Systems =
 
= Systems =
 +
 +
== High Voltage ==
 +
 +
* [[SBS EPICS]]
  
 
== Alarms ==
 
== Alarms ==
Line 35: Line 39:
 
== Beam Line ==
 
== Beam Line ==
  
 +
* [[Monitoring the Beam Line]]
 
* [https://hallaweb.jlab.org/wiki/images/c/ce/HallA_beamline_drawing.pdf Hall A beam line drawing (to be updated)]
 
* [https://hallaweb.jlab.org/wiki/images/c/ce/HallA_beamline_drawing.pdf Hall A beam line drawing (to be updated)]
 
* [[SBS checkout procedure]]  
 
* [[SBS checkout procedure]]  
Line 65: Line 70:
 
* Timing Hodoscope  
 
* Timing Hodoscope  
 
* Preshower and Shower
 
* Preshower and Shower
 +
**[[How to adjust discriminator threshold on HCAL DAC]]
  
 
=== Super BigBite ===  
 
=== Super BigBite ===  

Revision as of 14:06, 27 September 2021

Overview

This page gives instructions for various aspects of the experiment relating to each of the major subsystems and shift tasks.

Shift Roles

  • Shift Leader: Executes the Run Plan according to the Run Coordinator's instructions
  • Target Operator: Monitors the target system
  • Data Quality Monitor: Starts and stops CODA DAQ runs and monitors the quality of the data that is being recorded

Reporting and Logging

All shift takers should regularly log shift details in HALOG - the Hall A electronic logbook.

Shift leaders should fill out Beam Time Accounting (BTA) information during the shift.

Taking Data

  • Using the CODA DAQ
    • GUI Description
    • Starting a Run
    • Stopping a Run
  • Monitoring the data
  • Online analysis
  • Shift checklist

Recovery Procedures

Systems

High Voltage

Alarms

Beam Line

Target

Magnets

Detectors

BigBite

Super BigBite

  • GEMs
  • HCAL