File list

From Hall A Wiki
Jump to: navigation, search

This special page shows all uploaded files.

File list
 
First page
Last page
Date Name Thumbnail Size User Description Versions
22:39, 24 October 2008 IMG 9141.JPG (file) 126 KB Jinhuang he3 cell between NMR pickup coils 1
21:55, 24 October 2008 IMG 9067.JPG (file) 212 KB Jinhuang   2
10:19, 23 October 2008 Target ladder 2.png (file) 34 KB Brads   1
10:19, 23 October 2008 Target ladder 1.png (file) 106 KB Brads   1
21:56, 22 October 2008 IMG 9080.JPG (file) 1.37 MB Jinhuang target NMR preamplifier under shielding 1
21:55, 22 October 2008 IMG 9079.JPG (file) 1.23 MB Jinhuang Tuning Beam through target chamber 1
21:53, 22 October 2008 IMG 9070.JPG (file) 547 KB Jinhuang Storage of he3 cell 1
21:51, 22 October 2008 IMG 9041.JPG (file) 467 KB Jinhuang he3 cell shining under verticle pumping laser 1
21:50, 22 October 2008 IMG 9040.JPG (file) 442 KB Jinhuang Shadow of he3 cell under low power verticle pumping laser 1
21:47, 22 October 2008 IMG 8995.JPG (file) 615 KB Jinhuang Dr. Qiang Testing target EPR assembly 1
23:25, 20 October 2008 Rutgers comet.png (file) 18 KB Yqiang   1
23:24, 20 October 2008 Wm comet.png (file) 18 KB Yqiang   1
12:41, 20 October 2008 Target System.png (file)
Error creating thumbnail: File with dimensions greater than 12.5 MP
285 KB Yqiang   3
21:56, 16 October 2008 IMG 9026.JPG (file) 575 KB Jinhuang target setup 1
21:37, 13 October 2008 IMG 8873.JPG (file) 1.37 MB Jinhuang target pumping laser spot on oven 1
21:36, 13 October 2008 IMG 8882.JPG (file) 1.58 MB Jinhuang target laser alignment finished 1
21:33, 13 October 2008 IMG 8860.JPG (file) 614 KB Jinhuang Left HRS detector package 1
21:31, 13 October 2008 IMG 8784.JPG (file) 1.51 MB Jinhuang NMR water cell calibration 1
21:29, 13 October 2008 IMG 8673.JPG (file) 588 KB Jinhuang 6in mirrors for target pumping laser 1
21:24, 13 October 2008 IMG 8409.JPG (file) 721 KB Jinhuang Bigbite detector package 2
21:23, 13 October 2008 IMG 8408.JPG (file) 544 KB Jinhuang target oven and coils 2
14:11, 13 October 2008 Run1353-preshower.jpg (file) 135 KB Jinhuang   1
18:43, 24 September 2008 Vertical Coil Curr vs Setting.png (file) Vertical_Coil_Curr_vs_Setting.png 113 KB Jinhuang target vertical Helmholtz coil current control calibration. Data Points a marked by circles and linear fitting is solid line. Red marks data with ''Base Line Current''=15A, while blue mark ''Base Line Current' 1
16:32, 18 September 2008 IMG 8057.JPG (file) 595 KB Jinhuang Left HRS detector package in service position 1
16:32, 18 September 2008 IMG 8050.JPG (file) 555 KB Jinhuang target oven is installed 1
15:20, 16 September 2008 IMG 8034.JPG (file) 562 KB Jinhuang target coils 1
15:18, 16 September 2008 IMG 8041.JPG (file) 1.71 MB Jinhuang Right HRS in service position 1
15:17, 16 September 2008 IMG 8038.JPG (file) 1.81 MB Jinhuang bigbite detector package on stack & cabled 1
15:16, 16 September 2008 IMG 8035.JPG (file) 675 KB Jinhuang bigbite detector package on stack & cabled 1
15:14, 16 September 2008 IMG 8025.JPG (file) 599 KB Jinhuang bigbite sieve slit in position 1
15:00, 16 September 2008 IMG 8024.JPG (file) 717 KB Jinhuang bigbite front shielding with sieve slit is being installed 1
14:59, 16 September 2008 IMG 8023.JPG (file) 628 KB Jinhuang bigbite electronic package with RICH ready to be installed 1
14:55, 16 September 2008 IMG 7895.JPG (file) 217 KB Jinhuang New Sieve for LHRS 1
14:54, 16 September 2008 IMG 7890.JPG (file) 462 KB Jinhuang RICH detector under cosmic ray test 1
14:51, 16 September 2008 IMG 7350.JPG (file) 237 KB Jinhuang bigbite sieve slit 1
11:12, 7 August 2008 NMR Post 210.PNG (file) 1.18 MB YZhang Screen of a nomal NMR field sweep for he3 cell. Shift worker can check if they set the parameters right. 1
18:57, 6 August 2008 Epr.jpg (file) 29 KB Spin   1
18:56, 6 August 2008 Epr.JPG (file) 29 KB Spin   1
16:19, 29 July 2008 IMG 7333.jpg (file) 568 KB Jinhuang Expected cable connection on '''power supply''' for target Helmholtz Coils 1
21:41, 28 July 2008 Wiring Diagram.png (file) 48 KB Jinhuang   2
21:34, 28 July 2008 TimingDiagram.png (file) 116 KB Jinhuang timing of target spin state signal 1
15:24, 28 July 2008 IMG 7331.JPG (file) 223 KB Jinhuang A bug is found during cleaning up of counting house target lab 1
15:22, 28 July 2008 IMG 7328.JPG (file) 250 KB Jinhuang FAP laser is moved to counting house target lab 1
15:21, 28 July 2008 IMG 7319.JPG (file) 413 KB Jinhuang HAPPEX DAQ in counting house middle room 1
15:18, 28 July 2008 IMG 7312.JPG (file) 248 KB Jinhuang LHRS '''A1''' detector 1
15:17, 28 July 2008 IMG 7307.JPG (file) 361 KB Jinhuang PhD Student Xin Qian is working on wire chamber of Bigbite electron package 1
15:14, 28 July 2008 IMG 7306.JPG (file) 365 KB Jinhuang '''pivot area''' during transversity installation 1
21:05, 27 July 2008 Target schematic transversity.png (file) 76 KB Jinhuang Schematic Overview of Target Setup [http://www.jlab.org/exp_prog/proposals/06/PR06-010.pdf] 1
20:55, 27 July 2008 Target Setup in A1n.png (file) 79 KB Jinhuang Schematic Overview of Target Setup (Used during A1n Experiment) 1
21:09, 25 July 2008 ScreenShot86805.png (file) 41 KB Jinhuang NMR Sweep Status GUI snape shot for Hall A Polarized He3 Target spin flip control. 1
First page
Last page