Difference between revisions of "Subsystem progress tracking, 2020"
(→Beamline) |
|||
(One intermediate revision by the same user not shown) | |||
Line 8: | Line 8: | ||
* Milestones/tasks toward readiness for beam. | * Milestones/tasks toward readiness for beam. | ||
* Estimated timeline for completion of said milestones/tasks. | * Estimated timeline for completion of said milestones/tasks. | ||
− | * Any other issues: manpower/need for JLab resources/etc. | + | * Any other issues: assessment of manpower/anticipated need for JLab resources/etc. |
+ | |||
+ | The preferred method of collecting the documents is for the contact people to upload your document(s) to the SBS private DocDB ([https://sbs.jlab.org/cgi-bin/DocDB/private/DocumentDatabase link]), which requires your JLab CUE credentials, and then link to your DocDB entry at this wiki page. | ||
=Beamline= | =Beamline= |
Latest revision as of 12:52, 10 February 2020
Contents
- 1 GMN Run plan document
- 2 Beamline
- 3 Target
- 4 Moller Polarimeter
- 5 Left HRS
- 6 HV controls for SBS detectors
- 7 SBS equipment installation
- 8 DAQ electronics and software
- 9 Simulations and Data Analysis Software
- 10 DC power for spectrometer magnets
- 11 GEM chamber gas supply system
- 12 HCAL
- 13 BigBite DAQ and analysis
- 14 BigBite Shower/PreShower
- 15 BigBite Timing Hodoscope
- 16 GRINCH
- 17 BigBite GEMs
- 18 GEN-RP detectors
GMN Run plan document
- January 6 version PDF
The association of contact people with detectors is from the draft run plan document
The goal of this page is to collect a 1-2 page "living" assessment document, to be updated approximately ~monthly, that addresses the following items for each subsystem:
- Assessment of progress over the last six months or since previous collaboration meeting
- Milestones/tasks toward readiness for beam.
- Estimated timeline for completion of said milestones/tasks.
- Any other issues: assessment of manpower/anticipated need for JLab resources/etc.
The preferred method of collecting the documents is for the contact people to upload your document(s) to the SBS private DocDB (link), which requires your JLab CUE credentials, and then link to your DocDB entry at this wiki page.
Beamline
Contact person: Silviu Covrig (upstream anyway)
Target
Contact person: Dave Meekins
Moller Polarimeter
Contact person: Simona Malace
Left HRS
Contact Person: Bob Michaels
Left HRS detector reinstallation
Contact person: Jack Segal
HV controls for SBS detectors
Contact person: Bob Michaels
SBS equipment installation
Contact person: Jessie Butler
DAQ electronics and software
Contact person: Alex Camsonne
Simulations and Data Analysis Software
Contact Person: Andrew Puckett
- December 15, 2019 assessment PDF
DC power for spectrometer magnets
Contact: Jack Segal
GEM chamber gas supply system
Contact: Jack. Segal
HCAL
Contact: Brian Quinn
BigBite DAQ and analysis
Contact: Mark Jones
BigBite Shower/PreShower
Contact: Arun Tadepalli
BigBite Timing Hodoscope
Contact: Rachel Montgomery
GRINCH
Contact: Todd Averett
BigBite GEMs
Contact: Nilanga Liyanage
GEN-RP detectors
Contact: Brad Sawatzky