Line 5: | Line 5: | ||
== Agenda == | == Agenda == | ||
− | * Ed: | + | * Test stand and FEC (Ed): [https://hallaweb.jlab.org/wiki/images/9/90/Test_Stand_2.pdf] and [https://hallaweb.jlab.org/wiki/images/e/e0/FEC_versions.pdf] |
+ | * Target design update (Dipangkar): [https://hallaweb.jlab.org/wiki/images/b/b4/Tdis_target.pdf] | ||
+ | * Readout design (Kondo): [https://hallaweb.jlab.org/wiki/images/5/59/MTPC_padReadout.pdf] | ||
* General updates by everyone | * General updates by everyone | ||
== Minutes == | == Minutes == | ||
+ | |||
+ | * JLEIC fellowship to support student or post-doc - CHECK ANNOUNCEMENT! [https://www.eiccenter.org/jefferson-lab-eic-fellowships] | ||
+ | ** TDIS could be considered here | ||
+ | |||
+ | * Test stand (Ed): | ||
+ | ** Prepared document defining what we will be doing here at JLab | ||
+ | ** Plan to order CRU from Alice | ||
+ | ** Elevated costs of FEC built by Oak Ridge | ||
+ | ** Five FEC planned in order list | ||
+ | ** TPC with Flex circuitry may be the reason for elevated costs of FEC | ||
+ | ** Prototype level: hard connection for now (we don't need the flex circuitry at this moment) | ||
+ | |||
+ | * Target/detector design for prototype (Dutta): | ||
+ | ** support to hold target centered/aligned (2 main ideas being developed) | ||
+ | ** kapton to be stretched to make cell straight, as suggested by target group | ||
+ | ** Background particles - we should minimize material downstream | ||
+ | ** chiller outside to keep target at 80K | ||
+ | ** Do we really need cold target? Simulation should address that soon, since this defines important changes to the design. | ||
+ | *** For example, BONUS is considering 7.5atm deuterium in 40cm long straw at room temperature. Simulate this condition and compare! | ||
+ | ** Pressure tests to be done (with target group) | ||
+ | ** Consider to reduce end cap thickness (reduce background) | ||
+ | |||
+ | * Readout design (Kondo): | ||
+ | ** UVA discussing design of readout for prototype - sizes of pad elements | ||
+ | ** Simulations have shown high occupancy in inner radius - smaller elements planned for inner radii | ||
+ | ** More simulations needed to define sizes of readout elements | ||
+ | ** Studies of connections to the readout board during prototype phase | ||
==Organizational details== | ==Organizational details== |
Latest revision as of 16:10, 3 April 2018
Back to Tagged DIS run group >> Bi-monthly TDIS meetings
previous meeting << >> following meeting
Agenda
- Test stand and FEC (Ed): [1] and [2]
- Target design update (Dipangkar): [3]
- Readout design (Kondo): [4]
- General updates by everyone
Minutes
- JLEIC fellowship to support student or post-doc - CHECK ANNOUNCEMENT! [5]
- TDIS could be considered here
- Test stand (Ed):
- Prepared document defining what we will be doing here at JLab
- Plan to order CRU from Alice
- Elevated costs of FEC built by Oak Ridge
- Five FEC planned in order list
- TPC with Flex circuitry may be the reason for elevated costs of FEC
- Prototype level: hard connection for now (we don't need the flex circuitry at this moment)
- Target/detector design for prototype (Dutta):
- support to hold target centered/aligned (2 main ideas being developed)
- kapton to be stretched to make cell straight, as suggested by target group
- Background particles - we should minimize material downstream
- chiller outside to keep target at 80K
- Do we really need cold target? Simulation should address that soon, since this defines important changes to the design.
- For example, BONUS is considering 7.5atm deuterium in 40cm long straw at room temperature. Simulate this condition and compare!
- Pressure tests to be done (with target group)
- Consider to reduce end cap thickness (reduce background)
- Readout design (Kondo):
- UVA discussing design of readout for prototype - sizes of pad elements
- Simulations have shown high occupancy in inner radius - smaller elements planned for inner radii
- More simulations needed to define sizes of readout elements
- Studies of connections to the readout board during prototype phase
Organizational details
- 11:00 AM, JLab meeting room: CC A110
- To join the Meeting:
- To join via Room System:
- Video Conferencing System: bjn.vc -or-199.48.152.152
- Meeting ID : 550335940
- To join via phone :
- Dial:
- +1.408.740.7256 (United States)
- +1.888.240.2560 (US Toll Free)
- +1.408.317.9253 (Alternate number)
- (see all numbers - http://bluejeans.com/numbers)
- Enter Conference ID : 550335940
- Dial: