Line 14: Line 14:
 
* the power deposited in the target will require a significant gas flow for the target not to warm up.
 
* the power deposited in the target will require a significant gas flow for the target not to warm up.
 
* A few things need to be fixed:
 
* A few things need to be fixed:
**''need to add readout planes and GEM foils'' (available in [https://userweb.jlab.org/~efuchey/Documents/TDIS_Conditionnal_Approval_Release_Document.pdf 1], caption of Fig. 2).
+
**''need to add readout planes and GEM foils'' (available in [https://userweb.jlab.org/~efuchey/Documents/TDIS/TDIS_Conditionnal_Approval_Release_Document.pdf], caption of Fig. 2).
 
**close in from 0 to 100m away from beamline (instead of 0-900cm), if possible with a finer binning;
 
**close in from 0 to 100m away from beamline (instead of 0-900cm), if possible with a finer binning;
 
**would be nice to investigate strange behavior of background remarked on slide 5
 
**would be nice to investigate strange behavior of background remarked on slide 5

Revision as of 16:16, 18 February 2019

Back to Tagged DIS run group >> Bi-monthly TDIS meetings

previous meeting << >> following meeting

Agenda

Study of mTPC electronics radiation: mTPC electronics radiation study

Minutes

Discussion about Jixie's study. Encouraging preliminary results. Remarks:

  • Endcaps are likely thicker than they will be, but we want to keep it this way.
  • the power deposited in the target will require a significant gas flow for the target not to warm up.
  • A few things need to be fixed:
    • need to add readout planes and GEM foils (available in [1], caption of Fig. 2).
    • close in from 0 to 100m away from beamline (instead of 0-900cm), if possible with a finer binning;
    • would be nice to investigate strange behavior of background remarked on slide 5
  • Other smaller fixes (likes, not must):
    • check that material inside downstream beampipe in indeed vacuum, not air;
    • add the 20cm offset of the solenoid wrt the target


Other news:

  • setup of TDIS mailing list;
  • later this week, discussion with Sao Paulo group who expressed interest in TDIS beyond the participation to mTPC;
  • Dipangkar will setup a discussion with JLab engineering group about target
  • Doodle for new meeting timeslot

Organizational details

12:00 PM, JLab meeting room: CC F226
To join the Meeting:
https://bluejeans.com/550335940
To join via Room System:
Video Conferencing System: bjn.vc -or-199.48.152.152
Meeting ID : 550335940
To join via phone :
  1. Dial:
    +1.408.740.7256 (United States)
    +1.888.240.2560 (US Toll Free)
    +1.408.317.9253 (Alternate number)
    (see all numbers - http://bluejeans.com/numbers)
  2. Enter Conference ID : 550335940