Difference between revisions of "TDIS Bi-monthly meeting, 2020 February 25"

From Hall A Wiki
Jump to: navigation, search
(Agenda)
 
(6 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 
Back to [[Tagged DIS run group]] >> [[Tagged_DIS_run_group#Bi-monthly TDIS meetings|Bi-monthly TDIS meetings]]
 
Back to [[Tagged DIS run group]] >> [[Tagged_DIS_run_group#Bi-monthly TDIS meetings|Bi-monthly TDIS meetings]]
  
[[TDIS Bi-monthly meeting, 2020 February 11 |previous meeting]]  <<  >> [[TDIS Bi-monthly meeting, 2019 March 9 |following meeting]]
+
[[TDIS Bi-monthly meeting, 2020 February 11 |previous meeting]]  <<  >> [[TDIS Bi-monthly meeting, 2020 March 10 |following meeting]]
  
 
==Agenda==
 
==Agenda==
* All: any other updates;
+
All: any other updates;
 +
 
 +
==Minutes==
 +
Attendees: Thia, Steve, Carlos, Eric (onsite); Bogdan, Dipangkar, Marco Bregant, Paul, Rachel (online);
 +
 
 +
Short discussion on when the software (simulation, digitization, tracking) should converge: short answer: 4 months i.e. by the end of June 2020.
 +
* Steve: Resumed work on his python tracking code: for each pad, building a road of the previous and possible next pads for a track; also check that the neighboring pads are within the same time.
 +
Assumes 100% detection efficiency , ideal tracks; will require MC simulated tracks.
 +
* Carlos: putting effort to include the generators into g4sbs
 +
* Rachel: Update in mTPC conical shape [https://hallaweb.jlab.org/wiki/images/c/c3/Montgomery_UpdateTDIS_250220.pdf].
 +
* Eric: Effort on general SBS software (will eventually benefit to TDIS).
 +
* Thia: Will circulate a rough draft of the TDIS collaboration meeting on March 19 (from noon-ish to five-ish PM)
  
 
==Organizational details==
 
==Organizational details==

Latest revision as of 09:03, 9 March 2020

Back to Tagged DIS run group >> Bi-monthly TDIS meetings

previous meeting << >> following meeting

Agenda

All: any other updates;

Minutes

Attendees: Thia, Steve, Carlos, Eric (onsite); Bogdan, Dipangkar, Marco Bregant, Paul, Rachel (online);

Short discussion on when the software (simulation, digitization, tracking) should converge: short answer: 4 months i.e. by the end of June 2020.

  • Steve: Resumed work on his python tracking code: for each pad, building a road of the previous and possible next pads for a track; also check that the neighboring pads are within the same time.

Assumes 100% detection efficiency , ideal tracks; will require MC simulated tracks.

  • Carlos: putting effort to include the generators into g4sbs
  • Rachel: Update in mTPC conical shape [1].
  • Eric: Effort on general SBS software (will eventually benefit to TDIS).
  • Thia: Will circulate a rough draft of the TDIS collaboration meeting on March 19 (from noon-ish to five-ish PM)

Organizational details

11:00 AM, JLab meeting room: TED 2561A
To join the Meeting:
https://bluejeans.com/550335940
To join via Room System:
Video Conferencing System: bjn.vc -or-199.48.152.152
Meeting ID : 550335940
To join via phone :
  1. Dial:
    +1.408.740.7256 (United States)
    +1.888.240.2560 (US Toll Free)
    +1.408.317.9253 (Alternate number)
    (see all numbers - http://bluejeans.com/numbers)
  2. Enter Conference ID : 550335940