Difference between revisions of "TDIS Bi-monthly meeting, 2021 February 2"

From Hall A Wiki
Jump to: navigation, search
(Agenda)
 
(6 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 
Back to [[Tagged DIS run group]] >> [[Tagged_DIS_run_group#Bi-monthly TDIS meetings|Bi-monthly TDIS meetings]]
 
Back to [[Tagged DIS run group]] >> [[Tagged_DIS_run_group#Bi-monthly TDIS meetings|Bi-monthly TDIS meetings]]
  
[[TDIS Bi-monthly meeting, 2021 January 19 |previous meeting]]  <<  >> [[TDIS Bi-monthly meeting, 2021 February 16 |following meeting]]
+
[[TDIS Bi-monthly meeting, 2021 January 19 |previous meeting]]  <<  >> [[TDIS Bi-monthly meeting, 2021 February 23 |following meeting]]
  
 
==Agenda==
 
==Agenda==
* [https://hallaweb.jlab.org/wiki/images/1/1e/MTPC_design_for_TDIS_collab_2-2-2021_fnl.pdf Salina's update on mTPC prototype design] [https://hallaweb.jlab.org/wiki/images/0/0a/MTPC_design_for_TDIS_collab_2-2-2021_fnl.pptx ppt version]
+
* [https://hallaweb.jlab.org/wiki/images/c/c1/MTPC_design_for_TDIS_collab_2-2-2021_fnlcorr.pdf Salina's update on mTPC prototype design] [https://hallaweb.jlab.org/wiki/images/5/5c/MTPC_design_for_TDIS_collab_2-2-2021_fnlcorrppt.pptx ppt version]
 
* Arun: brief presentation of the TDIS Slack
 
* Arun: brief presentation of the TDIS Slack
 
* all: any other business
 
* all: any other business
Line 10: Line 10:
 
==Minutes==
 
==Minutes==
  
* mTPC prototype: Lead time/cost for components? 2-3 months / $5500; Full cylindrical prototype: also 2-3 months, but 30k cost.
+
* mTPC prototype:  
* testing plan: put it in beam during SBS (on the side for squared proto, around for the cylindrical)? Low energy proton tracks at the Duke facility?
+
** Lead time/cost for components? 2-3 months / $5500; Full cylindrical prototype: also 2-3 months, but 30k cost.
* Going forward with the square prototype.
+
** testing plan: put it in beam during SBS (on the side for squared proto, around for the cylindrical)? Low energy proton tracks at the Duke facility?
 +
** Going forward with the square prototype.
 +
 
 +
* Slack:
 +
** Should be more for short term discussions
 +
** drawback: cannot be used as an archive unless someone pays (JLab).
 +
** if JLab ever pays for SBS slack (very unlikely), then TDIS should be merged.
 +
 
 +
* subgroup simulation discussion: Digitization? Presentation in 2 weeks?
 +
* BoNuS wants a return of favor and want a TDIS talk. Arun will do it (Thank you!)
  
 
==Organizational details==
 
==Organizational details==

Latest revision as of 14:37, 15 February 2021

Back to Tagged DIS run group >> Bi-monthly TDIS meetings

previous meeting << >> following meeting

Agenda

Minutes

  • mTPC prototype:
    • Lead time/cost for components? 2-3 months / $5500; Full cylindrical prototype: also 2-3 months, but 30k cost.
    • testing plan: put it in beam during SBS (on the side for squared proto, around for the cylindrical)? Low energy proton tracks at the Duke facility?
    • Going forward with the square prototype.
  • Slack:
    • Should be more for short term discussions
    • drawback: cannot be used as an archive unless someone pays (JLab).
    • if JLab ever pays for SBS slack (very unlikely), then TDIS should be merged.
  • subgroup simulation discussion: Digitization? Presentation in 2 weeks?
  • BoNuS wants a return of favor and want a TDIS talk. Arun will do it (Thank you!)

Organizational details

11:00 AM *ONLINE ONLY*
To join the Meeting:
https://bluejeans.com/550335940
To join via Room System:
Video Conferencing System: bjn.vc -or-199.48.152.152
Meeting ID : 550335940
To join via phone :
  1. Dial:
    +1.408.740.7256 (United States)
    +1.888.240.2560 (US Toll Free)
    +1.408.317.9253 (Alternate number)
    (see all numbers - http://bluejeans.com/numbers)
  2. Enter Conference ID : 550335940