Difference between revisions of "TDIS Bi-monthly meeting, 2021 February 2"

From Hall A Wiki
Jump to: navigation, search
(Minutes)
(Minutes)
Line 12: Line 12:
 
* mTPC prototype: Lead time/cost for components? 2-3 months / $5500; Full cylindrical prototype: also 2-3 months, but 30k cost.
 
* mTPC prototype: Lead time/cost for components? 2-3 months / $5500; Full cylindrical prototype: also 2-3 months, but 30k cost.
 
* testing plan: put it in beam during SBS (on the side for squared proto, around for the cylindrical)? Low energy proton tracks at the Duke facility?
 
* testing plan: put it in beam during SBS (on the side for squared proto, around for the cylindrical)? Low energy proton tracks at the Duke facility?
 +
* Going forward with the square prototype.
  
 
==Organizational details==
 
==Organizational details==

Revision as of 12:32, 2 February 2021

Back to Tagged DIS run group >> Bi-monthly TDIS meetings

previous meeting << >> following meeting

Agenda

Minutes

  • mTPC prototype: Lead time/cost for components? 2-3 months / $5500; Full cylindrical prototype: also 2-3 months, but 30k cost.
  • testing plan: put it in beam during SBS (on the side for squared proto, around for the cylindrical)? Low energy proton tracks at the Duke facility?
  • Going forward with the square prototype.

Organizational details

11:00 AM *ONLINE ONLY*
To join the Meeting:
https://bluejeans.com/550335940
To join via Room System:
Video Conferencing System: bjn.vc -or-199.48.152.152
Meeting ID : 550335940
To join via phone :
  1. Dial:
    +1.408.740.7256 (United States)
    +1.888.240.2560 (US Toll Free)
    +1.408.317.9253 (Alternate number)
    (see all numbers - http://bluejeans.com/numbers)
  2. Enter Conference ID : 550335940