Difference between revisions of "TDIS Bi-monthly meeting, 2021 February 2"
From Hall A Wiki
(→Minutes) |
(→Agenda) |
||
Line 5: | Line 5: | ||
==Agenda== | ==Agenda== | ||
* [https://hallaweb.jlab.org/wiki/images/1/1e/MTPC_design_for_TDIS_collab_2-2-2021_fnl.pdf Salina's update on mTPC prototype design] [https://hallaweb.jlab.org/wiki/images/0/0a/MTPC_design_for_TDIS_collab_2-2-2021_fnl.pptx ppt version] | * [https://hallaweb.jlab.org/wiki/images/1/1e/MTPC_design_for_TDIS_collab_2-2-2021_fnl.pdf Salina's update on mTPC prototype design] [https://hallaweb.jlab.org/wiki/images/0/0a/MTPC_design_for_TDIS_collab_2-2-2021_fnl.pptx ppt version] | ||
− | * Arun: brief presentation of the | + | * Arun: brief presentation of the TDIS Slack |
* all: any other business | * all: any other business | ||
Revision as of 12:35, 2 February 2021
Back to Tagged DIS run group >> Bi-monthly TDIS meetings
previous meeting << >> following meeting
Agenda
- Salina's update on mTPC prototype design ppt version
- Arun: brief presentation of the TDIS Slack
- all: any other business
Minutes
- mTPC prototype: Lead time/cost for components? 2-3 months / $5500; Full cylindrical prototype: also 2-3 months, but 30k cost.
- testing plan: put it in beam during SBS (on the side for squared proto, around for the cylindrical)? Low energy proton tracks at the Duke facility?
- Going forward with the square prototype.
Organizational details
- 11:00 AM *ONLINE ONLY*
- To join the Meeting:
- To join via Room System:
- Video Conferencing System: bjn.vc -or-199.48.152.152
- Meeting ID : 550335940
- To join via phone :
- Dial:
- +1.408.740.7256 (United States)
- +1.888.240.2560 (US Toll Free)
- +1.408.317.9253 (Alternate number)
- (see all numbers - http://bluejeans.com/numbers)
- Enter Conference ID : 550335940
- Dial: