Difference between revisions of "Thursday, June 30, 2016, 10:00am EDT - Compton"

From Hall A Wiki
Jump to: navigation, search
(Electron detector)
(Laser)
Line 20: Line 20:
 
=== Laser ===
 
=== Laser ===
 
* Plans for summer repairs and improvements [https://hallaweb.jlab.org/dvcslog/compton/389]
 
* Plans for summer repairs and improvements [https://hallaweb.jlab.org/dvcslog/compton/389]
* Replacement power supply should have shipped June 24
+
* Replacement power supply should have shipped June 24 - still has not shipped
 
* Improved/updated laser interlock system will be installed
 
* Improved/updated laser interlock system will be installed
  

Revision as of 09:13, 28 June 2016

*********BLUEJEANS CALL-IN INSTRUCTIONS*********
----------------------------------------------------
1. Dial Toll-Free Number: 1-888-240-2560 (U.S. & Canada)
2. International participants dial:
Toll Number: 1-408-740-7256
3. Enter meeting ID:140287970

Desktop sharing:
https://bluejeans.com/140287970 

Agenda

Meeting room=F228 in Cebaf Center

General

  • "compton-old" will be shut down at the end of August - need to get everything moved to "compton"
  • Simulation: unified GEANT4-based Monte Carlo (update?)

Laser

  • Plans for summer repairs and improvements [1]
  • Replacement power supply should have shipped June 24 - still has not shipped
  • Improved/updated laser interlock system will be installed

Photon Detector

  • Updates on photon detector analysis
  • GEANT3 simulations of synchrotron backgrounds

Electron detector

  • Detector in Hall
    • FSD and "photon stopper" valve: need to test masking
  • QWAD tests: JLab (Hoskins/Camsonne)
  • QWAD tests: Manitoba

Minutes