Difference between revisions of "Thursday, May 10, 2018, 10:00 am EDT - Compton"

From Hall A Wiki
Jump to: navigation, search
(Add link to slides for Photon Detector status and plans)
 
Line 25: Line 25:
  
 
=== Photon Detector ===
 
=== Photon Detector ===
* GSO detector status
+
* GSO detector status [https://hallaweb.jlab.org/wiki/images/f/f1/Cornejo_comptonmeeting_20180510.pdf]
 
* DAQ status
 
* DAQ status
 
* Detector/DAQ task list [https://hallaweb.jlab.org/dvcslog/compton/413]
 
* Detector/DAQ task list [https://hallaweb.jlab.org/dvcslog/compton/413]

Latest revision as of 08:51, 10 May 2018

*********BLUEJEANS CALL-IN INSTRUCTIONS*********
----------------------------------------------------
1. Dial Toll-Free Number: 1-888-240-2560 (U.S. & Canada)
2. International participants dial:
Toll Number: 1-408-740-7256
3. Enter meeting ID:140287970

Desktop sharing:
https://bluejeans.com/140287970 

Agenda

Meeting room=B101 in Cebaf Center

General

  • Need to start ordering Compton equipment needed for PREX/CREX [1]
    • Funds available THIS fical year
  • Installation for PREX/CREX is rather short (~2 months)
    • Should take advantage of summer SAD as much as possible
  • After May 15, will be able to work in Hall A without restriction (tritium training not needed). This will be the case until September, when the tritium target is re-installed.

Laser

  • Laser task list [2]

Photon Detector

  • GSO detector status [3]
  • DAQ status
  • Detector/DAQ task list [4]

Electron detector

  • EEL test-stand update