Difference between revisions of "Thursday, May 26, 2016, 10:00am EDT - Compton"
From Hall A Wiki
(Added "Afterglow analysis") |
(Added link to Larisa meeting materials) |
||
Line 23: | Line 23: | ||
=== Photon Detector === | === Photon Detector === | ||
* Updates on photon detector analysis | * Updates on photon detector analysis | ||
− | ** Afterglow analysis (Larisa) | + | ** Afterglow analysis ( [http://albert.phys.cmu.edu:8080/Thorne/195 Larisa] ) |
* GEANT3 simulations of synchrotron backgrounds | * GEANT3 simulations of synchrotron backgrounds | ||
Revision as of 19:35, 24 May 2016
*********BLUEJEANS CALL-IN INSTRUCTIONS********* ---------------------------------------------------- 1. Dial Toll-Free Number: 1-888-240-2560 (U.S. & Canada) 2. International participants dial: Toll Number: 1-408-740-7256 3. Enter meeting ID:140287970 Desktop sharing: https://bluejeans.com/140287970
Agenda
Meeting room=F228 in Cebaf Center
General
- "compton-old" will be shut down at the end of August - need to get everything moved to "compton"
- Update on beam in Hall A in June?
Laser
- Plans for summer repairs and improvements [1]
Photon Detector
- Updates on photon detector analysis
- Afterglow analysis ( Larisa )
- GEANT3 simulations of synchrotron backgrounds
Electron detector
- Detector in Hall
- Update to FSD system for "photon stopper" valve
- QWAD tests: JLab (Hoskins/Camsonne)
- QWAD tests: Manitoba