Difference between revisions of "Thursday, October 13, 2016, 10:00am EDT - Compton"

From Hall A Wiki
Jump to: navigation, search
(Photon Detector)
 
(One intermediate revision by one other user not shown)
Line 26: Line 26:
  
 
=== Photon Detector ===
 
=== Photon Detector ===
* Detector installation and DAQ (Update from Juan Carlos and Abel)
+
* Detector status
 
* CMU DAQ update
 
* CMU DAQ update
 +
** BCM value double valued? [http://albert.phys.cmu.edu:8080/Juan+Carlos/24]
 
* Counting mode DAQ update
 
* Counting mode DAQ update
  

Latest revision as of 09:04, 13 October 2016

*********BLUEJEANS CALL-IN INSTRUCTIONS*********
----------------------------------------------------
1. Dial Toll-Free Number: 1-888-240-2560 (U.S. & Canada)
2. International participants dial:
Toll Number: 1-408-740-7256
3. Enter meeting ID:140287970

Desktop sharing:
https://bluejeans.com/140287970 

Agenda

Meeting room=F228 in Cebaf Center

General

  • Hall locked up
  • Schedule changes:
    • GMp runs first (no Compton). DVCS starts in maybe a couple weeks
    • Run extended to December 22
    • Might run over Thanksgiving

Laser

  • Successfully locking (thanks to Abdurahim's help from 2009!)
  • Mode match challenging - coupling not fully optimized, but can get ~ 2kW in cavity

Photon Detector

  • Detector status
  • CMU DAQ update
    • BCM value double valued? [1]
  • Counting mode DAQ update

Electron detector

  • Detector in Hall
    • FSD and "photon stopper" valve: need to test masking
    • Noise reduction?
  • QWAD tests: JLab (Hoskins/Camsonne)
  • QWAD tests: Manitoba

Minutes