Difference between revisions of "Thursday, September 13, 2018 2PM ET"

From Hall A Wiki
Jump to: navigation, search
(New page: Previous meeting: Friday, August 31, 2018 2PM ET Media:KK's MOLLER Task List.pdf ===Task List Summary=== * Simulation tasks [https://hallaweb.jlab.org/wiki/images/5/58/MOLLER_Tas...)
 
 
Line 17: Line 17:
  
 
==Attendance:==
 
==Attendance:==
Attendance:
+
Attendance: Rakitha, Chandan, KK, Kent, Cameron, Dustin, Seamus
  
  
 
==Minutes==
 
==Minutes==
*  
+
* Wiki page for the detector locations and detector id ranges for different ranges
 +
* New detector type to track more hit information based on different conditions.
 +
* Disk Space issues,
 +
** Old sensitivity studies data (Mindy) in the work disk staged to tape? to recover more space
 +
 
 +
 
 +
* Shielding,
 +
** Director's review for MOLLER
 +
** Plan for what to prepare for shielding review
 +
** Meet Monday around 9am to a plan ready for what we need to for shielding.
 +
 
  
 
<br><br> Return to [[Teleconferences]]
 
<br><br> Return to [[Teleconferences]]
 
<br> Return to [[MOLLER at 11 GeV E09-005]]
 
<br> Return to [[MOLLER at 11 GeV E09-005]]

Latest revision as of 14:44, 13 September 2018

Previous meeting: Friday, August 31, 2018 2PM ET

Media:KK's MOLLER Task List.pdf

Task List Summary


Agenda

  • Detector locations and numbering for Geant4 simulation
  • Work and Volatile disk space issues
  • Simulation coding updates
  • Air/Vacuum/He study
  • Sky-shine update

Attendance:

Attendance: Rakitha, Chandan, KK, Kent, Cameron, Dustin, Seamus


Minutes

  • Wiki page for the detector locations and detector id ranges for different ranges
  • New detector type to track more hit information based on different conditions.
  • Disk Space issues,
    • Old sensitivity studies data (Mindy) in the work disk staged to tape? to recover more space


  • Shielding,
    • Director's review for MOLLER
    • Plan for what to prepare for shielding review
    • Meet Monday around 9am to a plan ready for what we need to for shielding.




Return to Teleconferences
Return to MOLLER at 11 GeV E09-005