Difference between revisions of "Tuesday, Aug 6, 2013 11:00am EDT"

From Hall A Wiki
Jump to: navigation, search
(Agenda)
Line 6: Line 6:
  
 
==Agenda==
 
==Agenda==
* Review the cost of tracking assembly (KK)
+
* Review the cost of tracking assembly for 3 GEM system (KK)
** 3 GEM planes
+
** GEMs and associated electronics
** GEM sensors and associated electronics
+
 
** GEM surface area (covering 25% feasible?)
 
** GEM surface area (covering 25% feasible?)
** GEM support structure
+
** support structure
  
 
*Nilanga's questions:
 
*Nilanga's questions:

Revision as of 22:56, 5 August 2013

Back to Main Page >> Meetings >> Teleconferences

Logistic information

   Phone number:  1-866-740-1260
   Access code:   1978431#

Agenda

  • Review the cost of tracking assembly for 3 GEM system (KK)
    • GEMs and associated electronics
    • GEM surface area (covering 25% feasible?)
    • support structure
  • Nilanga's questions:
    • Given ~75 um position resolution, can we get the required accuracy for MOLLER from 3 GEMs in air, one after the vacuum window, one before the quartz, and one in middle?
    • Given 3 z-locations, what should be the dimensions of the GEMs (to capture Moller, ep & enough of the radiative tail)?
    • What are the required resolutions in r and phi?