Difference between revisions of "Tuesday, August 16, 2016 12:00 noon EST"
From Hall A Wiki
Line 3: | Line 3: | ||
* Mainz (May 2016) beam test results | * Mainz (May 2016) beam test results | ||
* Work package scope and costing update | * Work package scope and costing update | ||
− | * Progress on detector specific simulations | + | * Progress on detector specific simulations [[Img:Comparison_of_CAD_and_GDML_Detector_Geometry.pdf]] |
* CDR Document / Proposal Modifications | * CDR Document / Proposal Modifications | ||
* Beam tests in Mainz with photons from the A2 tagger | * Beam tests in Mainz with photons from the A2 tagger |
Revision as of 10:47, 16 August 2016
Possible Agenda:
- Mainz (May 2016) beam test results
- Work package scope and costing update
- Progress on detector specific simulations Img:Comparison_of_CAD_and_GDML_Detector_Geometry.pdf
- CDR Document / Proposal Modifications
- Beam tests in Mainz with photons from the A2 tagger
Call-in Instructions:
Bluejeans:
Phone number: 1-888-240-2560 Meeting ID: 2254687741#