# Prototype coils
 
# Prototype coils
## JLAB is holding up power supply and cable delivery
+
## JLAB is holding up power supply and cable delivery - hopefully 1st week July
 
## Going to ask Javier to get in touch with Jim Coleman
 
## Going to ask Javier to get in touch with Jim Coleman
## water test requires some techs
+
## water test requires some techs, booster pump
 
## let us know if you need any "hands"
 
## let us know if you need any "hands"
 
# Sensitivity study
 
# Sensitivity study
 +
## problems with job submission discovered and fixed
 +
## sensitivities seem less restrictive than hybrid
 +
## maybe because field integral smaller
 +
## finish by end of summer
 +
# Collimator simulations
 +
## Rakitha - shielding mass around target
 +
## Chandan and Cameron around collimators
 +
## Full range of radiation estimates by end of summer (site boundary, hall radiation, bkgds det plane)
 +
## Cameron moving to thesis
 
# Collaboration meeting with Bluejeans calls  
 
# Collaboration meeting with Bluejeans calls  
 
## possibly 2 half-day calls in July 16 and August 9
 
## possibly 2 half-day calls in July 16 and August 9
 +
# next teleconference on the 3rd
  
  
 
Return to [[Teleconferences]]<br>
 
Return to [[Teleconferences]]<br>
 
Return to [[MOLLER at 11 GeV E09-005]]
 
Return to [[MOLLER at 11 GeV E09-005]]

Revision as of 10:22, 12 June 2018

previous meeting << >> following meeting

Logistic information

 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 International toll number:         408-740-7256
 Bluejeans CODE:                    734 609 7559
 Bluejeans link: https://bluejeans.com/7346097559

Agenda

  1. Prototype coil
    1. water pressure test results
    2. test plan
  2. Sensitivities update
  3. Collimator simulations update

Minutes

Attendance: Juliette, Sakib, KK, Ernie, Jim, Jason

  1. Prototype coils
    1. JLAB is holding up power supply and cable delivery - hopefully 1st week July
    2. Going to ask Javier to get in touch with Jim Coleman
    3. water test requires some techs, booster pump
    4. let us know if you need any "hands"
  2. Sensitivity study
    1. problems with job submission discovered and fixed
    2. sensitivities seem less restrictive than hybrid
    3. maybe because field integral smaller
    4. finish by end of summer
  3. Collimator simulations
    1. Rakitha - shielding mass around target
    2. Chandan and Cameron around collimators
    3. Full range of radiation estimates by end of summer (site boundary, hall radiation, bkgds det plane)
    4. Cameron moving to thesis
  4. Collaboration meeting with Bluejeans calls
    1. possibly 2 half-day calls in July 16 and August 9
  5. next teleconference on the 3rd