Difference between revisions of "Tuesday, June 12, 2018 10:00am ET"
From Hall A Wiki
Line 16: | Line 16: | ||
== Minutes == | == Minutes == | ||
− | Attendance: | + | Attendance: Juliette, Sakib, KK, Ernie, Jim, Jason <br> |
+ | # Prototype coils | ||
+ | ## JLAB is holding up power supply and cable delivery | ||
+ | ## Going to ask Javier to get in touch with Jim Coleman | ||
+ | ## water test requires some techs | ||
+ | ## let us know if you need any "hands" | ||
+ | # Sensitivity study | ||
+ | # Collaboration meeting with Bluejeans calls | ||
+ | ## possibly 2 half-day calls in July 16 and August 9 | ||
Return to [[Teleconferences]]<br> | Return to [[Teleconferences]]<br> | ||
Return to [[MOLLER at 11 GeV E09-005]] | Return to [[MOLLER at 11 GeV E09-005]] |
Revision as of 09:11, 12 June 2018
previous meeting << >> following meeting
Logistic information
BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 International toll number: 408-740-7256 Bluejeans CODE: 734 609 7559 Bluejeans link: https://bluejeans.com/7346097559
Agenda
- Prototype coil
- water pressure test results
- test plan
- Sensitivities update
- Collimator simulations update
Minutes
Attendance: Juliette, Sakib, KK, Ernie, Jim, Jason
- Prototype coils
- JLAB is holding up power supply and cable delivery
- Going to ask Javier to get in touch with Jim Coleman
- water test requires some techs
- let us know if you need any "hands"
- Sensitivity study
- Collaboration meeting with Bluejeans calls
- possibly 2 half-day calls in July 16 and August 9
Return to Teleconferences
Return to MOLLER at 11 GeV E09-005