Difference between revisions of "Tuesday, September 17, 2013 2:00pm EST"
From Hall A Wiki
(→Agenda) |
(→Minutes) |
||
Line 8: | Line 8: | ||
== Minutes == | == Minutes == | ||
− | Attending: | + | Attending: Juliette, KK, Tyler, Jason |
+ | |||
+ | # interferences of tracks with supports | ||
+ | ## mollers - blue, eps - green | ||
+ | ## | ||
+ | # | ||
+ | # Jason working on frame, Jim is working on vacuum vessel | ||
+ | ## frame will hang off lid of vacuum chamber | ||
+ | ## Jason is looking into load condition | ||
+ | ## Ernie is working on the detailed coil design (water-cooling, electrical, tolerances, tooling, machining) | ||
+ | ## working toward a cost estimate | ||
<br><br> Return to [[Teleconferences]] | <br><br> Return to [[Teleconferences]] | ||
<br> Return to [[MOLLER at 11 GeV E09-005]] | <br> Return to [[MOLLER at 11 GeV E09-005]] |
Revision as of 14:07, 17 September 2013
Last meeting: Tuesday, August 27, 2013 2:00pm EST
Agenda
- Update from KK/Tyler Support-track interference
- Update from Juliette iron in coils
- Update from Jason
Minutes
Attending: Juliette, KK, Tyler, Jason
- interferences of tracks with supports
- mollers - blue, eps - green
- Jason working on frame, Jim is working on vacuum vessel
- frame will hang off lid of vacuum chamber
- Jason is looking into load condition
- Ernie is working on the detailed coil design (water-cooling, electrical, tolerances, tooling, machining)
- working toward a cost estimate
Return to Teleconferences
Return to MOLLER at 11 GeV E09-005