(Created page with "Back to Main Compton Page >> Compton Meetings <pre> *********BLUEJEANS CALL-IN INSTRUCTIONS********* --------------------------------...") |
(→Minutes) |
||
(One intermediate revision by the same user not shown) | |||
Line 33: | Line 33: | ||
== Minutes == | == Minutes == | ||
+ | |||
+ | Mark D, Dave G, Don, Adam, Alex, Brian, Jinlong, JCC, Cip, Michael G | ||
+ | |||
+ | # General/CREX analysis | ||
+ | ## Beam through the chicane. Looked good. | ||
+ | ## There were laser-on drifts due to beam motion in the chicane. | ||
+ | ## Ops want us to use the Moller lock during production. This would require changing the lock. We're happy with any solution that locks to the Compton table BPMs. | ||
+ | ## Some snail have very good data: good separation, small error, good chi2. Some have double peaking in the pedestal. | ||
+ | ## Use snapshot pedestal to correct accumulators? Code doesn't exist, would need to be developed. | ||
+ | ## TODO Make plot of pedestal as function of time from snapshots. | ||
+ | ## Discussion about reading out tube voltage and current or DAQ temperature. | ||
+ | # Electron detector | ||
+ | ## Adaptor boards have not been tested yet so the reaming boards haven't been populated with resistors. It will take about 1-2 weeks to stuff the boards and another 2 weeks to ship them once the correct resistor has been verified. |
Latest revision as of 15:05, 22 January 2020
Back to Main Compton Page >> Compton Meetings
*********BLUEJEANS CALL-IN INSTRUCTIONS********* ---------------------------------------------------- 1. Dial Toll-Free Number: 1-888-240-2560 (U.S. & Canada) 2. International participants dial: Toll Number: 1-408-740-7256 3. Enter meeting ID:140287970 Desktop sharing: https://bluejeans.com/140287970
Agenda
Meeting room = Counting House Meeting Room
=== General ===Beam through Compton last week!
Electron detector
- Detector status
- QWAD adapter boards
- Counting DAQ
Laser
- Cavity/laser status
Photon Detector
- Detector, DAQ status
Analysis
- Online analysis results
Minutes
Mark D, Dave G, Don, Adam, Alex, Brian, Jinlong, JCC, Cip, Michael G
- General/CREX analysis
- Beam through the chicane. Looked good.
- There were laser-on drifts due to beam motion in the chicane.
- Ops want us to use the Moller lock during production. This would require changing the lock. We're happy with any solution that locks to the Compton table BPMs.
- Some snail have very good data: good separation, small error, good chi2. Some have double peaking in the pedestal.
- Use snapshot pedestal to correct accumulators? Code doesn't exist, would need to be developed.
- TODO Make plot of pedestal as function of time from snapshots.
- Discussion about reading out tube voltage and current or DAQ temperature.
- Electron detector
- Adaptor boards have not been tested yet so the reaming boards haven't been populated with resistors. It will take about 1-2 weeks to stuff the boards and another 2 weeks to ship them once the correct resistor has been verified.