Difference between revisions of "Wednesday, March 20, 2019, 11:00 am EST"

From Hall A Wiki
Jump to: navigation, search
(Created page with "Back to Main Compton Page >> Compton Meetings <pre> *********BLUEJEANS CALL-IN INSTRUCTIONS********* --------------------------------...")
 
Line 23: Line 23:
 
** Plans during installation period
 
** Plans during installation period
 
** !0 W fiber amp available April 8
 
** !0 W fiber amp available April 8
** additional 10 fiber amp inprocurement
+
** additional 10 fiber amp in procurement
 
** Seed laser setup
 
** Seed laser setup
 
** Polarization scan tests?
 
** Polarization scan tests?
Line 38: Line 38:
 
** Signal amplification
 
** Signal amplification
 
** Diamond
 
** Diamond
 +
** HVMAPS
  
 
== Minutes ==
 
== Minutes ==

Revision as of 05:44, 19 March 2019

Back to Main Compton Page >> Compton Meetings

*********BLUEJEANS CALL-IN INSTRUCTIONS*********
----------------------------------------------------
1. Dial Toll-Free Number: 1-888-240-2560 (U.S. & Canada)
2. International participants dial:
Toll Number: 1-408-740-7256
3. Enter meeting ID:140287970

Desktop sharing:
https://bluejeans.com/140287970 

Agenda

Meeting room= F227 in Cebaf Center

General

  • Discussion of test

Laser

  • Laser update
    • Plans during installation period
    •  !0 W fiber amp available April 8
    • additional 10 fiber amp in procurement
    • Seed laser setup
    • Polarization scan tests?

Photon Detector

  • GSO detector status
  • Online analysis

Simulation

Electron detector

  • Update on test plans
    • Signal amplification
    • Diamond
    • HVMAPS

Minutes