Difference between revisions of "Wednesday, May 9, 2018 3:00pm ET"

From Hall A Wiki
Jump to: navigation, search
(Minutes)
Line 35: Line 35:
 
## sensitivity studies
 
## sensitivity studies
 
## prototype
 
## prototype
# New meeting time?
+
# New meeting time
## Possibly  
+
## Possibly meet at 2pm ET
  
 
Return to [[Teleconferences]]<br>
 
Return to [[Teleconferences]]<br>
 
Return to [[MOLLER at 11 GeV E09-005]]
 
Return to [[MOLLER at 11 GeV E09-005]]

Revision as of 15:30, 9 May 2018

previous meeting << >> following meeting

Logistic information

 BlueJeans calling instructions:
 Toll-Free Number (U.S.&  Canada):  888-240-2560
 International toll number:         408-740-7256
 Bluejeans CODE:                    734 609 7559
 Bluejeans link: https://bluejeans.com/7346097559

Agenda

  1. Status reports
    1. Simulations
      1. Collimator/shielding
      2. Sensitivity studies
    2. Prototype tests
  2. New meeting time?

Minutes

Attendance: Juliette, KK, Kent, Cameron, Jason, Sakib

  1. Status reports
    1. Simulations
      1. Collimator/shielding
        1. Cameron working on it; coordinating with Kent and Chandan
      2. Sensitivity studies
        1. Upstream Magnet: Taking too long on farm; going to use lower statistics runs
        2. Beamline sensitivity: coil dose, radial position at entrance to dump
        3. segmented magnet (issues: a lot of water connections, supports, alignment) (benefits: pressure drop, easier to make)
          1. try to break off pieces and see where things start to fall apart
    2. Prototype tests
      1. power supply needed from JLAB
      2. push forward with water flow tests
  2. Collaboration Meeting end of July, early August
    1. shielding
    2. sensitivity studies
    3. prototype
  3. New meeting time
    1. Possibly meet at 2pm ET

Return to Teleconferences
Return to MOLLER at 11 GeV E09-005