Difference between revisions of "Wednesday, May 9, 2018 3:00pm ET"
From Hall A Wiki
(→Minutes) |
(→Minutes) |
||
Line 38: | Line 38: | ||
## Possibly meet at 2pm ET Wed | ## Possibly meet at 2pm ET Wed | ||
## Tuesday morning at 10am ET starting on the 15th | ## Tuesday morning at 10am ET starting on the 15th | ||
+ | ### Collimator status and prototype timeline/plan | ||
+ | ### on 29th, sensitivity studies and prototype results | ||
Return to [[Teleconferences]]<br> | Return to [[Teleconferences]]<br> | ||
Return to [[MOLLER at 11 GeV E09-005]] | Return to [[MOLLER at 11 GeV E09-005]] |
Latest revision as of 15:37, 9 May 2018
previous meeting << >> following meeting
Logistic information
BlueJeans calling instructions: Toll-Free Number (U.S.& Canada): 888-240-2560 International toll number: 408-740-7256 Bluejeans CODE: 734 609 7559 Bluejeans link: https://bluejeans.com/7346097559
Agenda
- Status reports
- Simulations
- Collimator/shielding
- Sensitivity studies
- Prototype tests
- Simulations
- New meeting time?
Minutes
Attendance: Juliette, KK, Kent, Cameron, Jason, Sakib
- Status reports
- Simulations
- Collimator/shielding
- Cameron working on it; coordinating with Kent and Chandan
- Sensitivity studies
- Upstream Magnet: Taking too long on farm; going to use lower statistics runs
- Beamline sensitivity: coil dose, radial position at entrance to dump
- segmented magnet (issues: a lot of water connections, supports, alignment) (benefits: pressure drop, easier to make)
- try to break off pieces and see where things start to fall apart
- Collimator/shielding
- Prototype tests
- power supply needed from JLAB
- push forward with water flow tests
- Simulations
- Collaboration Meeting end of July, early August
- shielding
- sensitivity studies
- prototype
- New meeting time
- Possibly meet at 2pm ET Wed
- Tuesday morning at 10am ET starting on the 15th
- Collimator status and prototype timeline/plan
- on 29th, sensitivity studies and prototype results
Return to Teleconferences
Return to MOLLER at 11 GeV E09-005