Difference between revisions of "Wednesday, November 6, 2019, 11:00 EST"
From Hall A Wiki
(→Electron detector) |
|||
Line 22: | Line 22: | ||
=== Electron detector === | === Electron detector === | ||
* Detector installation | * Detector installation | ||
+ | ** detector in place pumping, 3 new 500 um silicons and plan C thick | ||
+ | **quote for top plate with 4 connectors 4500 $ | ||
+ | **IOC working for LV and HV ( had to replace some connectors which fell on floor ) | ||
+ | **Issue with motion control, Ben looking at it | ||
+ | **FSD seems ok but need to test when magnet are on | ||
+ | **one missing HV distribution board | ||
+ | **VETROC adapter and QWAD cable adapter ordered (1500$ !) | ||
+ | **to do | ||
+ | ***power detector, check noise | ||
+ | ***cosmics | ||
* QWAD adapter boards | * QWAD adapter boards | ||
* Spare QWADs | * Spare QWADs | ||
* Counting DAQ | * Counting DAQ | ||
− | |||
=== Laser === | === Laser === |
Revision as of 10:25, 6 November 2019
Back to Main Compton Page >> Compton Meetings
*********BLUEJEANS CALL-IN INSTRUCTIONS********* ---------------------------------------------------- 1. Dial Toll-Free Number: 1-888-240-2560 (U.S. & Canada) 2. International participants dial: Toll Number: 1-408-740-7256 3. Enter meeting ID:140287970 Desktop sharing: https://bluejeans.com/140287970
Contents
Agenda
Meeting room = Cebaf Center F226
General
- Hall A will start earlier than originally planned - Monday, November 25
- Hall will be locked up for high current test Wednesday or Thursday
Electron detector
- Detector installation
- detector in place pumping, 3 new 500 um silicons and plan C thick
- quote for top plate with 4 connectors 4500 $
- IOC working for LV and HV ( had to replace some connectors which fell on floor )
- Issue with motion control, Ben looking at it
- FSD seems ok but need to test when magnet are on
- one missing HV distribution board
- VETROC adapter and QWAD cable adapter ordered (1500$ !)
- to do
- power detector, check noise
- cosmics
- QWAD adapter boards
- Spare QWADs
- Counting DAQ
Laser
- New LOSP in effect - everyone needs LTT, new walkthrough. No one is authorized to use system until this is done.
- Complete new laser safety training by end of month
- Mirror replacement in progress
Photon Detector
- PREX checks - complete (?)
- CREX preparations
Analysis
- ACC0 - laser-cycle analysis
- ACC4 - laser cycle analysis