Privacy
and Security Notice
Link to November, 2002
Link to October, 2002
Link to September, 2002
02/20/2003
Small angle GDH preparation:
- Vince:
- need coils calibration.
- Jian-Ping suugested to have the field survey on 2 days to have time for the coils to warm up.
- will be good to have the current of the coils in the datastream (EPICS).
- want to calibrate the gradient coils and maybe the correction coils too.
- Patricia:
- will need 3 sets of RTDs for the pol. 3He cells and 2 sets for the reference cells.
- need 2 oven RTDs.
- try to have the ref. cell RTD working
- Jian-Ping:
- would like to have the HARP installed
- will run in-time mode
Spin duality Analysis:
- Vince:
- got nice water signals during the past weekend with the help of Jaideep,
- in the process to analyze them.
- showed 3 GeV scaler analysis.
- Patricia:
- EPR-NMR calibration on Exodus: only the 3 last measurements can be taken into account since the polarization wasn't uniform in the cell yet.
- Detector calibration: Left and right cerenkov are done. Now checking the efficiency of each mirror.
- Plan:
--> finish detector calibration,
--> asymetries for each run with the new detector calibration,
--> target polarization analysis.
g2n analysis :(Kevin)
- working on radiative corrections.
GDH analysis:(Karl)
- showed his first try of the GDH integral at 1.7GeV.