Counting Room Status (Hall A counting room may be unmanned.):
Prior to closing the Hall Check End station Status:
- [ ]
- Clean power in Hall A is to be turned off.
- [ ]
- Spectrometers rotated out of beam direction.
- [ ]
- Targets in extracted position.
- [ ]
- Drift Chamber gases are turned off at gas shed.
- [ ]
- Confirm clean/safe status of shield house area and Hall.
- [ ]
- Beamline to dump configured appropriate for beam energy/current
- [ ]
- Confirm that any hall ventilation which exhausts air to the environment is turned off.
- [ ]
- Confirm that beamline and target chamber are from unnecessary equipment and clutter.
- [ ]
- Confirm that beam line and target structures have been wiped down in the last six months or since the last maintenance activity to remove dust and grease which presents a source of loose radioactivity.
being used.
- [ ]
- Confirm that all magnet power supplies shut-off and
locked/tagged at breakers in
Hall A or alternately the Hall A console key for both HRS power supplies be in
the ``off" position with key removed. The key must be removed from the counting
house and held in the possession of one of the following individuals:
K. de Jager, J. Proffitt, or E. Folts
Signature Date
Monitoring of superconducting magnets cryogenics done according to
normal standby mode procedures.