- ... requiredA1
- particularly,
a new calibration has to be done
after the substitution of the complete target castle,
if the vertical alignment values are changed
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
- ... positionA2
- The reference position must be detected
once when installing the target and once
when checking the alignments of
the reference points with the metric rulers on the top of the
scattering chamber. Here we use the reference position,
the waterfall target position and at zero degrees angle. Changing
the target block, a new reference point must be detected.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
- ... (up/down)A3
- One single encoder step error means an offset error of
about 0.04 degrees, or 0.006 mm.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
- ... pump.A4
- The scale is in %.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.