Pre Beam and Cryo Target Checklist

   Cryo Target Pre Beam Checklist  Date______     time _______  

                                                                        Last revised 3/6/98

This checklist will be completed after every restricted access to Hall A during which maintenance is performed

People checking list _______________________________________________________

Electron Arm

 

Spectrometers

___     correct angle ___________ (not to be used for calculations)

___     correct pointing _________(not to be used for calculations)

___     collimator operation at 3 positions

___     check spectrometer for obstructions to movement

___     check intergen bottles for correct pressure

___     insure that 15 degree stop pin is installed

 

Vacuum

___     blower on at controls under spectrometer

___     turbo on at turbo controller in rack # 1H71B01

___     pump valves open at valve controller in rack # 1H71B01  channel #2

___     convectron gages read "0" millitorr

___     roughing valve closed at rack #1H71B01 channel # 4

___     cold cathode gages on at gage in rack # 1H71B01 cold cathode < 5x10-5

___     actual cold cathode reading ________

___     entrance & exit vacuum windows functional

 

magnet controls

Q1

___     Q1 full of liquid  (80%) actual______

___     open lead flows on Q1 to 80 slm as read from rack #Q171Q

___     actual lead flows       A______ B______

___     cctv camera on and focused

 

D1

___     Dipole full of liquid  (80%) actual______

___     open lead flows on Dipole to 80 slm as read from rack #D171Q

___     actual lead flows       A______ B______

 

Q2

___     Q2 full of liquid  (80%) actual______

___     open lead flows on Q2 to 60 slm as read from the Q2 instrument rack meter.

___     actual lead flows       A______ B______

 

Q3

___     Q3 full of liquid  (80%) actual______

___     open lead flows on Q3 to 60 slm as read from the Q3 instrument rack meter.

___     actual lead flows       A______ B______

 

 Power supplies

                POWER SUPPLY TURN ON PROCEDURES

 

___     Verify UPSs as operational on all power supply controls (with no current on magnets only)

___     red rotating beacons on

 

Q1:     

___     visual inspection of main current leads, dump resistor, and lead flags (for condition, visual shorts, etc.)

___     unlock power disconnect switch and turn on AC power

___     visually check power supply for faults

___     when all faults have been cleared, insure that power supply is in remote control

 

Q2:     

___     visual inspection of main current leads, dump resistor, and lead flags (for condition, visual shorts, etc.)

___     unlock power disconnect switch and turn on AC power

___     turn on both sets of three pole breakers located on power supply

___     visually check power supply for faults

___     when all faults have been cleared, lift lever on lower right side of supply

___     insure that power supply is in remote control

 

Q3:

___     visual inspection of main current leads, dump resistor, and lead flags (for condition, visual shorts, etc.)

___     unlock power disconnect switch and turn on AC power

___     turn on both sets of three pole breakers located on power supply

___     visually check power supply for faults

___     when all faults have been cleared, lift lever on lower right side of supply

___     insure that power supply is in remote control

 

Dipole:

___     visual inspection of main current leads, dump resistor, and lead flags (for condition, visual shorts, etc.)

___     unlock power disconnect switch and turn on AC power

___     turn on power lever on right upper side of supply

___     visually check power supply for faults on supply and at rack #

___     when all faults have been cleared, insure that power supply is in remote control

___     cctv camera on and focused

___     check power supply for proper polarity

___     NMR gradient compensation for on and proper polarity

 

Hadron Arm

 

Spectrometers

___     correct angle ___________ (not to be used for calculations)

___     correct pointing _________(not to be used for calculations)

___     collimator operation at 3 positions

___     check spectrometer for obstructions to movement

___     check intergen bottles for correct pressure

___     insure that 15 degree stop pin is installed

 

Vacuum

___     blower on at controls under spectrometer

___     turbo on at turbo controller in rack # 1H71B01

___     pump valves open at valve controller in rack # 1H71B01  channel #2

___     convectron gages read "0" millitorr

___     roughing valve closed at rack #1H71B01 channel # 4

___     cold cathode gages on at gage in rack # 1H71B01 cold cathode < 5x10-5

___     actual cold cathode reading ________

___     check dipole turbo for on

 

magnet controls

Q1

___     Q1 full of liquid  (80%) actual______

___     open lead flows on Q1 to 80 slm as read from rack #Q171Q

___     actual lead flows       A______ B______

___     cctv camera on and focused

 

D1

___     Dipole full of liquid  (80%) actual______

___     open lead flows on Dipole to 80 slm as read from rack #D171Q

___     actual lead flows       A______ B______

 

Q2

___     Q2 full of liquid  (80%) actual______

___     open lead flows on Q2 to 60 slm as read from the Q2 instrument rack meter.

___     actual lead flows       A______ B______

 

Q3

___     Q3 full of liquid  (80%) actual______

___     open lead flows on Q3 to 60 slm as read from the Q3 instrument rack meter.

___     actual lead flows       A______ B______

 

 

 

 

 

 Power supplies

                POWER SUPPLY TURN ON PROCEDURES

 

___     Verify UPSs as operational on all power supply controls (with no current on magnets only)

___     red rotating beacons on

 

Q1:     

___     visual inspection of main current leads, dump resistor, and lead flags (for condition, visual shorts, etc.)

___     unlock power disconnect switch and turn on AC power

___     visually check power supply for faults

___     when all faults have been cleared, insure that power supply is in remote control

 

Q2:     

___     visual inspection of main current leads, dump resistor, and lead flags (for condition, visual shorts, etc.)

___     unlock power disconnect switch and turn on AC power

___     turn on both sets of three pole breakers located on power supply

___     visually check power supply for faults

___     when all faults have been cleared, lift lever on lower right side of supply

___     insure that power supply is in remote control

 

Q3:

___     visual inspection of main current leads, dump resistor, and lead flags (for condition, visual shorts, etc.)

___     unlock power disconnect switch and turn on AC power

___     turn on both sets of three pole breakers located on power supply

___     visually check power supply for faults

___     when all faults have been cleared, lift lever on lower right side of supply

___     insure that power supply is in remote control

 

Dipole:

___     visual inspection of main current leads, dump resistor, and lead flags (for condition, visual shorts, etc.)

___     unlock power disconnect switch and turn on AC power

___     turn on power lever on right upper side of supply

___     visually check power supply for faults on supply and at rack #

___     when all faults have been cleared, insure that power supply is in remote control

___     cctv camera on and focused

___     check power supply for proper polarity

___     NMR gradient compensation for on and proper polarity

 

 

 

  Target

___     windows functional      

___     cctv cameras "on" and focused

___     target light "on"

___     backing pump "on" at pump

___     turbo "on" at rack # 1H75B09

___     turbo valve "open" at rack # 1H75B09 channel # 1

___     gages operational

___     convectron "0" millitorr at rack # 1H75B09

___     cold cathode < 5x10-4 at rack # 1H75B08

___     actual cold cathode reading __________

 

 

Exit beam tube

___     backing  pump "on" at pump and operational

___     valve "open" controlled at rack # 1H75B09  channel # (temp manual at pump)

___     turbo "on" at rack #  1H75B09           

___     gages operational

___     convectron "<5" millitorr at rack # 1H75B09

___     actual  convection reading ________

___     diffuser cooler on

___     diffuser water level ok

 

 

 

Entrance beam tube

___     insure that Møller turbo is on and running

___     insure that Møller target cooler is on and operational

___     insure that there is cooling water flow to the Møller Dipole

___     insure that ep turbo is on and running

___      beam line vacuum valves "open" (visually checked)

___     instrument air compressor functioning normally

 

 

 Hall

___     all interlocks in rack # 1H75B08 indicate green

___     check 3 Møller power supplies for on (lights flashing at magnets)

___     check location and operational readiness of Ion chambers

___     correct LCW flow and pressure (100 psi supply and 60 psi return)

___     cctv cameras on and focused

___     cctv monitors at X terminal off

___     clear of unnecessary equipment

___     Man lift and Forklift in truck ramp

___     perform pre sweep of run safe boxes

___     unnecessary personnel exit Hall

___     move Electron spectrometer stairs clear of lower balcony

___     ensure polar crane is positioned over the entrance beam pipe

and that power is off at the power disconnect switch

___     ensure spectrometer entrance window guards are removed

___     ensure target window guards are removed