Post Beam Checklist for Maintenance Period

                                                                        Revised 2/22/99

This checklist will be completed prior to every restricted access to Hall A during which maintenance is performed

People checking list _______________________________________________________

   

 Spectrometers

___     NOTE :  LOOK FOR "RADIATION AREA" SIGN and OBEY

___     Install yellow covers on inlets to spectrometers

 

  Target

___     NOTE :  LOOK FOR "RADIATION AREA" SIGN and OBEY

___     Install protective shields over vacuum windows if Cryo target is installed

 

Power supplies

        ( from a computer console )

Electron

___     set current to 0 amps by remote control on Q1

___     set current to 0 amps by remote control on Q2

___     set current to 0 amps by remote control on Q3

___     set current to 0 amps by remote control on Dipole

Hadron

___     set current to 0 amps by remote control on Q1

___     set current to 0 amps by remote control on Q2

___     set current to 0 amps by remote control on Q3

___     set current to 0 amps by remote control on Dipole

 

Entrance beam tube

___     NOTE :  LOOK FOR "RADIATION AREA" SIGN and OBEY

 

Exit beam tube

___     NOTE :  LOOK FOR "RADIATION AREA" SIGN and OBEY

 

Dump

___     NOTE :  LOOK FOR "RADIATION AREA" SIGN and OBEY

___     Inspect visible areas for water leaks

     Hall

___     NOTE :  LOOK FOR "RADIATION AREA" SIGN and OBEY

___     Inspect power supply platforms, spectrometers, and the rest of the Hall, looking for water leaks and cryogenic plumes

___     Man lift and Forklift removed from truck ramp