Jian-ping began the meeting with a brief summary of the important issues
Alexandre Deur worked on a Monte Carlo simulation for E97-110:
- Wall Thickness:
- Radiative tails:
- New cell design:
- Lasers
- VDC
completed in Root/C++ analyzer
- RCS experiment
will use Root for calorimeter
- ESPACE will be
available as a back up
- Root was used
this past summer for the optics calibration
- The Root analyzer
needs to be tested with existing data (Ole)
- Ole Hansen will
add a Helicity variable to the next version of the Root Analyzer
- Students showed
support to move to the new Root Analyzer
Run Plan by Alexandre Deur:
- 18 days of running
- Use HRS in parallel
configuration, with 2 independent DAQs. Total Rate ~ 6 kHz
- Change angle ~
1 shift (w/o survey), survey (or pre-survey position?)
- Beam current at
10 uA with raser on. May run at lower current
- Water Calibration
(Vince)
- Commissioning
Survey: oven, target ladder, pick-up coils, HRS/septa
- NMR loss measurements
- Study residual
field from septa
- Compton: continuous
running (Alexandre)
- Moller/Mott (Alexandre/Eugene)
- Deadtime requirement
< 20%
DAQ:
Implement high rate capability (Piotr/Bob Michaels)
Man power/responsibilities:
- Analyzer(C++):
Xiaofeng Zhu; ESPACE: Nilanga
- Beamline:
Alexandre/Doug or Bodo
- Target:
Students/Xiaofeng; reference cell: Nilanga/Todd Averett
- Slow control:
Kathy(?), Pavel
- Septa:
Franco/Guido
- Detectors:
Ron Gilman
- Optics commissioning:
Doug/Nilanga/Guido/LeRose
- Analysis
of optics data: Nilanga/students
- New design
(collimator, cell): Alexandre/J-P
- Carbon Target:
Nilanga
Vincent Sulkosky discussed the target lab status:
- Field calibrations
completeted including holding field and RF field (Vince/Jindong)
- Pick-up
coils and wires replaced with new ones
- Water signal
tests completed by changing the vertical and horizontal position
of the water cell (Vince/Jindong/Xiaofeng)
- New Q-coil
made, and several Q-curves measured (Vince)
- Optical
alignment for longitudinal paths with laser pointer completed (Patricia/Vince)
- Wall thickness
on all cells used during the experiment is completed except
for the 25 cm water cell (Vince/Jindong)
- RTD tests
being conducted (Patricia/Jindong)
Things to do for the target lab:
- Wall thickness
for the 25 cm water cell (Jindong)
- Laser Alignment
(Vince/Patricia/Xiaochao)
- Clean optical
fibers (Patricia)
- Finish the
RTD's (Patricia/Jindong)
- Analyze
water signal data (Vince/Kevin)
- Install
polarized He-3 cell (Vince)
- Spin up
tests (Vince/Jindong)
- Setup EPR
system (Patricia/Jindong/Xiaofeng)
- Test EPR
system (Jindong/Patricia/Xiaofeng)
Back to Main Minutes page.