Main INDEX
Monthly INDEX
PREV
NEXT
User name V. Sulkosky
Log entry time 13:28:43 on October23,2007
Entry number 209338
Followups:
keyword=S2 TDC after Timing adjustments (RHRS)
Figure 1 shows the S2 TDC spectra after the timing was adjusted by B.
Michaels. The S2 right PMTs now define the timing for the trigger.
This was done by delaying the right PMT signals by 16 ns compared to
the left PMTs on S2.
The timing between S1, S2, Cerenkov and strobe were all checked. Some
minor adjustments were made for S1, Cerenkov and strobe (reductions
in the delays by 8-16 ns). The timing after adjustments looked good.
FIGURE 1