User name V. Sulkosky
Log entry time 19:27:08 on February 21, 2009
Entry number 262534
This entry is a followup to: 262525
Followups:
keyword=Experiment Summary for Feb 17, Day - Feb 18, Day
Summary for Feb 17 day - Feb 18 day
Beam studies and longitudinal production.
Beam in Use
shift |
ABU |
BANU |
BNA |
2009/02/17 day | 0.00 |
0.00 | 8.00 |
2009/02/17 swing | 2.76 |
4.29 | 0.95 |
2009/02/18 owl | 6.97 |
0.43 | 0.60 |
2009/02/18 day | 5.17 |
0.56 | 2.27 |
total | 14.9 |
5.3 | 11.8 |
Main events/issues:
- February 17th
- 08:00-14:00 Beam Studies and controlled access.
- Controlled access: magnet work, BigBite Cerenkov flash ADC
implementation
and replacement of Moller power supply.
- Target spin rotated to longitudinal.
- 14:00-16:00 Beam restoration and set up for BCM calibration.
- 16:00-17:00 BCM calibration.
- 17:00-18:30 Beam profile and raster check.
- 18:30-19:00 Controlled access for BigBite Cerenkov work.
- 19:00-19:30 Beam restoration and profile check.
- 19:30-19:40 DAQ tests.
- 19:40-21:15 N2 reference cell run and start of longitudinal
production.
- 21:15-23:00 Controlled access for DAQ work.
- 23:20 Resume longitudinal production and continue
kinematic L: Plhrs = 1.6 GeV/c, 45o.
- February 18th
- 02:15 beam half-wave plate inserted.
- 06:00 beam half-wave plate removed.
- Average target polarization: ~ 58.0% from swing shift 2/17
through owl shift 2/18.
- Total accummulated charge for kinematic L: 1.0 C out of 1.30 C.
- Total accummulated charge for longitudinal production: 0.38 C
out of 0.65 C.