Log entry time 01:50:37 on April 23, 2009
Entry number 267428
Followups:
keyword=The coincidence trigger and the BB re-timing problems
During the controlled access (9pm - 11pm) Bryan and myself went down the
hall to set up the coincidence triggers (T5 and T6) and the Big-Bite
re-timing.
Based on the EDTM signal and our calculations of the delay between the
L-HRS and BB, we first applied some additional delay to the T1 (E-plane
trigger ) and T2 (dE-plane trigger) triggers so that these to signals
came in the middle of the T3 triggers (from the LHRS). Then we formed the
coincidence triggers (T5 = T1 and T3) and (T6 = T2 and T3).
However, when we checked the time difference between the L1A signal from
the TS and the analog signal to the ADCs we realized that the gate for
the ADC comes to late. This poses a serious problem, because if (at the
current setting) we want a coincidence trigger we miss the ADC signal.
On the other hand if we take some of the delay out from the T1 and T2, so
that catch the analog signal to the ADC, than T3 comes to late and we can
not form the coincidence triggers.
We haven't figured out yet, what could be the best solution of this
problem. The first option would be to find out if the T3 signal can come
faster from the L-HRS. The other possible solution is to introduce some
additional delay to the ADC-signals. For this we would need 96 60ns cables.
In the end we have decided to set a simple trigger until the morning. We
have taken away some delay off the T1 so that now(according to the EDTM
calibration) T1 signal comes approx. 30ns before the T3 signal, which
causes that the ADC gate opens fast enough for the ADC signal. Then we
set the BB re-timing in a way that the gate for the ADCs is always timed
of the T1. We left the T2 out of the re-timing, because we weren't able
to set the delay for the T2 properly (ran out of time) and would mess out
re-timing. Therefore should runs, that will be taken during the night
have the T2 pre-scaled out.