• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name R. Michaels

    Log entry time 15:19:32 on April 27, 2009

    Entry number 269143

    This entry is a followup to: 269140

    keyword=scaler synch

    Scaler event type 140 are not inserted at the same time and it would
    be impossible and unnecessary to do so. In addition TS11 and TS0 are
    separate datastreams (different Trig. Super.) so the scalers in events
    only come from one HRS.

    What needs to be synched is the start and stop times, and the total
    integration time of the runs. And I think there may be a problem
    with that. I'll consult with Bo.

    A copy of this log entry has been emailed to: ellie,zhaobo