User name V. Sulkosky
Log entry time 19:33:38 on June 13, 2009
Entry number 281103
This entry is a followup to: 281092
Followups:
keyword=Experiment Summary for June 10 owl - June 10 swing
Summary for June 10 owl - June 10 swing
Smooth 2nd pass production.
Beam in Use
shift |
ABU |
BANU |
BNA |
2009/06/10 owl | 5.54 |
0.86 | 1.59 |
2009/06/10 day | 5.52 |
1.19 | 1.29 |
2009/06/10 swing | 6.92 |
0.63 | 0.45 |
total | 18.0 |
2.7 | 3.3 |
Main events/issues:
June 10, 2009
- BHWP: IN, Target spin: Transverse
- 00:00-00:35 Reference cell data.
- 00:38 Change right HRS P0 = 1.865 GeV/c for Delta data.
- 00:40 Continue 3He(e,e'd) production for left HRS.
- 02:15 Right dipole set and begin Delta production.
- 04:45-6:07 Beam down due to North LINAC RF problem.
- 08:55 Beam half-wave plate retracted.
- 11:40-12:10 Rotate target direction from Transverse to Longitudinal.
- 13:25-14:02 No beam due to cooling water to beam dump trip.
- 16:45-18:45 Laser work during production running:
- 16:15 Target polarization 60.1%.
- 16:45 lasers off to check fiber connections.
- Discoverd two laser fibers were damaged.
- Replaced with better fibers.
- 18:10 Lasers turned back on.
- One fiber is still hot.
- 18:44 Target polarization drops to 51.2% during work.
- Runs taken during this work: 3450-3453 and 22321-22324.
- 17:55 Beam half-wave plate inserted.
- Average target polarization for June 10th: 57.6%.