keyword=Experiment Summary for June 13 owl - June 13 swing
Summary for June 13 owl - June 13 swing
Recovery from R-HRS dipole quench and resume 3rd pass
production
at start of Day shift.
Beam in Use
shift |
ABU |
BANU |
BNA |
2009/06/13 owl | 4.70 |
2.84 | 0.47 |
2009/06/13 day | 6.03 |
1.39 | 0.58 |
2009/06/13 swing | 5.38 |
0.60 | 2.02 |
total | 16.1 |
4.8 | 3.1 |
Main events/issues:
June 13, 2009
- BHWP: IN, Target spin: Longitudinal
- 00:00-01:25 Several HRS magnets down due to right dipole quench: Left
Q1 and dipole, Right Q1, dipole and Q3.
- 01:25 Left HRS magnets recovered. Ask for beam.
- 01:48 Resume production on polarized 3He with left HRS
only
while waiting for right HRS to recover.
- 02:15 Right HRS dipole and Q3 faults will not clear. Tech-on-call on
his way to help reset them.
- 02:50-03:30 Controlled access for Ed Folts to reset right dipole
and Q3.
- 03:30-08:00 Right Dipole slowly ramping up to 3.0855 GeV/c.
- 07:30 Begin taking Right HRS runs, momentum settling within a few
MeV.
- 14:08-15:00 Problems with left DAQ.
- 15:56 Beam half-wave plate moved OUT.
- 22:19-24:00 Beam off due to NL06 low liquid level due to tripped
vacuum pump.
- Average target polarization for June 13th: 62.6%.