User name V. Sulkosky
Log entry time 11:35:33 on June 15, 2009
Entry number 281558
This entry is a followup to: 281364
keyword=Experiment Summary for June 14 owl - June 15 owl
Summary for June 14 owl - June 15 owl
3rd pass production.
Beam in Use
shift |
ABU |
BANU |
BNA |
2009/06/14 owl | 3.83 |
1.96 | 2.21 |
2009/06/14 day | 6.66 |
0.73 | 0.60 |
2009/06/14 swing | 4.54 |
2.12 | 1.34 |
2009/06/15 owl | 5.51 |
0.60 | 1.89 |
total | 20.5 |
5.4 | 6.1 |
Main events/issues:
June 14, 2009
- BHWP: OUT, Target spin: Longitudinal
- 00:00-01:00 Beam off due to vacuum problem in NL06.
- 01:00-03:30 Beam tuning, position and profile check.
- 03:30 Resume production on polarized 3He.
- 04:25-04:50 Mulitple wire chamber trips and beam down.
- 06:15 Begin target spin rotation to Transverse.
- 06:15-08:09 Calibration runs with reference cell: 3He,
empty, H2 and N2.
- 08:22 Begin transverse production on 3He.
- 08:38 BigBite and HAND HV trip due to beam excursion.
- 09:20 BigBite and HAND HV trip due to beam excursion.
- 16:30-17:50 Controlled Access:
- Swap hydrogen bottle for deuterium.
- Compton electronics work.
- 18:00-18:20 Beam restoration, position and raster check.
- 18:23-18:41 Deuterium reference cell run.
- 18:50 Resume transverse production.
- 20:00 Request MCC to insert BHWP.
- 20:04-21:00 Beam off due to HV Gun comparator FSD trips.
- Average longitudinal target polarization for June 14th:
63.2%.
- Average transverse target polarization for June 14th:
56.2%.
June 15, 2009
- BHWP: IN, Target spin: Transverse
- 00:00-07:01 Smooth production running on polarized 3He.
- 07:01 Beam off, end of 3He(e,e'd) and BigFamily of
Experiments!
- Average transverse target polarization for June 15th:
56.3%.
- Total charge for 3rd pass:
- 0.9C Longitudinal.
- 0.9C Transverse.