Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name R. Michaels
Log entry time 20:34:03 on June16,2009
Entry number 281789
Followups:
keyword=Compton activity, part I
20:17 permission granted to put Edet into electron position.
Previously, with 5-pass and 60 uA the Edet was drawing too much
current (off-scale) so we'll slowly increase current and see
what we can tolerate.
Edet at 7 mm. Beam current 6 uA. Rates seem tolerable,
Edet is drawing ~1.6 uA which is pretty high.
Michel has prepared a firmware to trigger on photon and make
an "unbiased snapshot" of the Edet, as far as I understand it.
We speculate that the inefficiency is due to background and
noise fooling the trigger -- maybe. Will use it shortly.
Starting with a normal firmware.
Run number 17545 .... Test2 config.