• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name pzhu

    Log entry time 01:35:39 on April18,2012

    Entry number 376053

    This entry is a followup to: 376044

    keyword=optics run start

    we start to run optics with 1V slow raster size(about 1.9cm) and 2x2 fast raster size and 50nA current. the beam position is the center position which I posted in 376044 Entry.